My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO 2006 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 4:57:32 PM
Creation date
11/5/2018 3:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2007
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\800\PR0231349\COMPLIANCE INFO 2006 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2007
QuestysRecordDate
2/16/2018 6:39:17 PM
QuestysRecordID
3798594
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: M Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution:0.5% of span <br /> Piping Run#91 <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: SMITH <br /> Piping Diameter: 3" <br /> Length of Piping Run: 165 ft. <br /> Product Stored: Gasoline <br /> Method and location of Reducer Boots/Fittings <br /> pipm -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes <br /> starting test: <br /> Test Start Time: 9:15am <br /> Initial Reading(RI): 5 psi <br /> Test End Time: 10:15am <br /> Final Reading(RF): 5 psi <br /> Test Duration: I hr. <br /> Change in Reading(RF-RI): none <br /> Pass/Fail Threshold or No detectable Loss <br /> Criteria: <br /> Test Result: X Pass 0 Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.