My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
800
>
2300 - Underground Storage Tank Program
>
PR0231349
>
COMPLIANCE INFO 2006 - 2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2021 4:57:32 PM
Creation date
11/5/2018 3:55:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2007
RECORD_ID
PR0231349
PE
2351
FACILITY_ID
FA0003633
FACILITY_NAME
ARCO 07049
STREET_NUMBER
800
Direction
E
STREET_NAME
KETTLEMAN
STREET_TYPE
Ln
City
Lodi
Zip
95240
APN
06206042
CURRENT_STATUS
01
SITE_LOCATION
800 E Kettleman Ln
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\K\KETTLEMAN\800\PR0231349\COMPLIANCE INFO 2006 - 2007.PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2007
QuestysRecordDate
2/16/2018 6:39:17 PM
QuestysRecordID
3798594
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oonitoring System Certification <br /> Site Address: 800 KETTLEMAN LN <br /> Date of Testing/Service: 05/02/2007 <br /> PTO N-85 <br /> F. In-Tank Gauging / SIR Equipment ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> is section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> mplete the following checklist: <br /> ❑Yes ❑No` Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> 0 Yes ❑No Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No` Was accuracy of system product level readings tested? <br /> ❑Yes ❑No Was accuracy of system water level readings tested? <br /> ❑Yes ❑No Were all probes reinstalled properly? <br /> X❑Yes ❑No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> *In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br /> mplete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> Yes ❑No E]N/A (Check all that apply)Simulated leak rate: 9P <br /> ❑X 3 h ❑0.1 g.p.h [:]0.2 g.p.h <br /> Yes ❑No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Yes ❑NoWas the testing apparatus properly calibrated? <br /> ]Yes I ]No- ❑N/A For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> Yes ❑No= ❑N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Yes ❑No ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> Yes F-1 No ❑N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> Yes ❑No ❑N/A For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> Yes I❑No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> n the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> -1. Comments: <br /> Page 3 of 3 Based on CA form dated 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.