STATE OF CALIFORNIA W&LY STATEMENT <br /> DEPMTMENT OF TRANSPORTATION ,z)t S T a.nP <br /> OF WORKING DAYS File Index No. 27 <br /> 10-S3-4-R17 . 4 <br /> He 66 1OA514 REPORT NO 13 <br /> (REV 9.79) <br /> To O. H. Materials Contractor <br /> The following statement shows the number of working days charged to your contract for the week ending February 28, 19 $6 <br /> s Working Days <br /> Non-Working No Work <br /> Date Day Weather,Weather Conditions or , Working Days Done an <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Mon. I Wet cfrade 1 <br /> Tue. n <br /> Wed. tt 1 <br /> Thur. <br /> n 1 <br /> Fri. tr 1 <br /> Daysthis week------------------------------- --------------- -----•-----------'-------------------—'—- - -------- <br /> Days previously reported---------------.-.-------------------------------------- --— - -"----- <br /> Total days to date---------`------------------- ...................------ - <br /> CCO Numbers Days Approved <br /> TIME EXTENSIONS (Note 3) CCO Other <br /> Days this report....--._--------_------- ..... _.- -- - -- ------- — <br /> Days previously reported_.__................... -------------—------ --— -- _--- ---------------•--------------- <br /> Totaldays to date...__---------—.......... ------------I---------•--------------------- -------------- - ------------- - <br /> Number Numbered Day Date <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION of Days (Note 5) <br /> 1. Date Contract approved by Attorney General__.-- .--------—-------------—---------------»---____...-----»- <br /> 2. Working days specified in contract__.—____—..._------—-------- <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)._..__—..._____- <br /> a <br /> A. Total time extension days approved to date{CCO plus -------.------- <br /> 5. Total nen-working days to date (Note 4)------------ ----- --------------- ------- ------------_ �r £ , <br /> An <br /> d. Sub Total (Line 4 plus line $)---.-----•----------........-------------------------___-----------------_.-------------•- <br /> 7. EXTENDED DATE FOR COMPLETION {Line 3 plus Line 6)— 45 <br /> 8. Revised working days for contract (Line 2 plus Line 4) —» � { ' <br /> 9. Total working days to doh__-.._ <br /> F, 5 <br /> 10. WORKING DAYS REMAINING (Line 8 minus Line St)-____—___ _—____. _---__.___—_ <br /> Soil tests , backfill <br /> Controlling Operafion(s <br /> REMARKS: (Note 6) (Continue an reverse) <br /> R. R. Lesan <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- Resident Engineer <br /> nese of the statement; otherwise the statement shall be deemed to have been accepted by <br /> the Contractor as correct. NOTE- All footnotes are on reverse side. <br /> 84 89199 <br />