Laserfiche WebLink
STATE OF CALIFORNIA MOKLY STATEMENT <br /> DEPARTMENT OF TRANSPORTATIONOF WORKING SAYS I CC g S FAMo File Index No. 27 <br /> He as RECiEE1�`s� wif; ��$ 10-SJ-4-R17 . 4 REPORT NO. 14 <br /> (REV 9.79) 1OA514 <br /> i <br /> To 0. H. Materials Contractor <br /> The following statement shows the number of working days charged to your contract for the week ending March 7 , 1986 <br /> Working Days <br /> Non-Working No Work <br /> Date Dap Weather,Weather Conditions or Working Days Done on <br /> Other Conditions (Note 1) Day Caused by Controlling <br /> Weather Operation <br /> (Note 2) <br /> Man, Fair 1 <br /> Tue. �� 1 <br /> Wed. �� 1 <br /> Thur. <br /> 1 <br /> Fri. Rain 1 <br /> Daysthis week----------- - —........... ----.....-_..----------—---------_-----------—----------------------------—-------... _..-- <br /> 30 35 <br /> Days previously reported-------------- ------•----•----------------—. —... --- —- ---- — <br /> 392 <br /> Total days to date..................... ........-• --------------_-------- — — — — :;4 <br /> CCO Numbers 'Days Approved <br /> TIME EXTENSIONS (Note 3) <br /> CCO Other <br /> Daysthis report-------------------------_---------_----------------------------- - ----- ------- — <br /> Dogs previously reported--.------,------------------- --- - -._.._ ._------.....-- -------- - — ----------- - - ---------------------- <br /> Totaldays to date-- --------------------------------- ------------------. --------•-----------— — _ --- —._... —- ------------------- <br /> COMPUTATION OF EXTENDED DATE FOR COMPLETION Number Numbered Day Date <br /> of Days (Note 5) <br /> 1. Daft Contract approved by Attorney General—__._ ----------—--------_. ------------------------- <br /> 2. Working days specified in contract------_—.---_--------__ <br /> 3. COMPUTED DATE FOR COMPLETION (if all days specified are workable)...,._•....____.—___.—_____ <br /> 4. Total time extension days approved to date (CCO plus other)___----___._._....--------------_-------------------- ------- � <br /> 5. Total man-working days to date (Note 4)----- —_--...__—__---.---------- <br /> 6. Sub Total (Line 4 plus Lime 5)---.._-w.__............... <br /> -31 -86 <br /> 7. EXTENDED DATE FOR COMPLETION (Line 3 plus Line -- <br /> jxara 2 <br /> 8. Revised working days for contract (Line 2 plus Lina 4).--_— __------ -------- $' <br /> 9. Total working days to dare__--•------ __---------- ----- ------• <br /> 10. WORKING DAYS REMAINING (Line 8 minus Line <br /> Controlling Operation(s)__ S o i l tests h rV k f i 1 1 <br /> REMARKS: (Note 6) (Continue on reverse) <br /> 4 1 <br /> The Contractor will be allowed fifteen (15) days in which to protest in writing the correct- Resident Englnter <br /> nos of the statement; otherwise the statement shall be deemed to have been accepted by <br /> the Contractor as correct. NOTE: All footnotes are on reverse side. <br /> ai eai9a <br />