Laserfiche WebLink
Sep - 26 . 2003 10 : 55AM LC qERVICES No -2685 P . 3 <br /> SwRM January 2002 <br /> Pegg 2 ct 3 <br /> 5.SECONDARY PIPE TESTING <br /> Test Method Developed By: <Piping Manufacturer J Industry Standard { <br /> Professional Engineer <br /> <Other(Specify <br /> Test Method Used: J Pressure <br /> <VaCaum Hydrost8tic <br /> <Qther(Spee#y) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 1 PSI <br /> Piping Run 91 <br /> Piping Run 89 Piping Run 67 Piping Run <br /> Piping Material FG FG FG <br /> Piping Manufacturer: Amer Amerpn <br /> Ameron <br /> Pipin Diameter 2" 2" — <br /> Length of Piping Run: 2" <br /> Iso' 130, 130' <br /> Product Stored: 81 UNL, ) 89 UN <br /> $7 UNL4 <br /> Method and location of piping- <br /> run isolation Booted at STp and UDC Booted at STD aITnd UDC Booted at STD and UDC <br /> Wait time between applying <br /> pressurelvacumelwater and <br /> staring test: 15 min <br /> 15 min 15 min <br /> Test Start Time. 2:15 <br /> 2:15 2:15 <br /> Initial Reading; 5si <br /> P 5 pia 5 psi <br /> Test End Time: 2:45 <br /> 2:45 2:45 <br /> Final Reading; 5si <br /> p ENo <br /> 5 psi <br /> Test Duration: 30 min <br /> 30 min <br /> Change in Reading: a Pass/Fail Threshold or Criteria: o <br /> No Dacay y No Decay <br /> Test Result: J Pass <Falle <br /> Fail J Pass <Fail <Pass <Fail <br /> Comm rats- include information on repairs made riot to resting,and reconm e1nded ollow-u or failed tests) <br /> Piping Runs 87,89,&81 (RETEST <br /> Tightened Bravo nuts in UDC's <br />