Laserfiche WebLink
SWRCB.January 2002 Page 6 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT(UDC) TESTING <br /> Test Method Developed By: 1` Tank Manufacture ti industry Standard i_ Professional Engineer <br /> C Other(S eci ) <br /> Test Method Used; A Pressure Vacuum Hydrostatic <br /> Other(S ) <br /> Test Equipment Used: Incon TS-STS JUuiQment Resooiutlon: 0.0001 <br /> UDC# DISP 9-10 UDC# DISP 11-12 UDC# UDC# <br /> UDC Manufacturer. Bravo Bravo <br /> UDC Material: Steel Steel <br /> UDC Depth: 9" g• <br /> Height from UDC Top to Top of <br /> Highest Piping Penetration: <br /> Height from UDC Top to Lowest <br /> Electrical Penetration: V 1•• <br /> Condition of UDC prior to testing: Good Good <br /> Portion of UDC Tested: All All <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product <br /> and water)? 1 Yes ❑ No V' NA ; Yes 7 No VNA _ Yes _l No E NA Yes ❑ No C NA <br /> Turbine shutdown response time <br /> Js system programmed for fail-safe <br /> shutdown?' ❑ Yes I1 No V" NA C' Yes D No v NA Ll Yes © No ❑ NA L Yes LZ No ❑ NA <br /> Was fail-safe verified to be <br /> operational?' L Yes ❑ No v NA Yes ❑ No Vi NA n Yes ❑ No i NA ❑ Yes ❑ No ❑ NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: 15 min 15 min <br /> Test Start Time: 18:48 18:48 <br /> Initial Reading'. 0.357 0.1955 <br /> Test End Time: 19:03 19:03 <br /> Final Reading- 0.357 0.1566 <br /> Test Duration: 15 min 15 min <br /> Change in Reading: 0 0.0399 <br /> Pass/Fail Threshold or Criteria: -0.002 _0,00,2 <br /> Test Result: pass I.I Fail ❑ Pass W Fail F Pass .-1 Fail L Pass i Fail <br /> Was Sensor removed for testing? C Yes No V" NA 11 Yes _i No v NA ❑ Yes ❑ No D NA ❑ Yes L No NA <br /> Was sensor property replaced and <br /> verified functional after testing? 0 Yes C No v NA El Yes 11 No V' NAI❑ Yes ❑ No L NA ❑ Yes ❑ No [1 NA <br /> C'ominents—(include rnformotPon on repairs made prior to te.stinZ,and recoirerrrended Jollo,4-up jor failed tests) <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions <br /> indicated with an asterisk(*) is"NO"or"NA",the entire sump trust be tested. (See SWRCB LG-160) <br />