My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1996 - 2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
140
>
2300 - Underground Storage Tank Program
>
PR0505687
>
COMPLIANCE INFO 1996 - 2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:39:59 PM
Creation date
11/5/2018 4:32:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1996 - 2004
RECORD_ID
PR0505687
PE
2361
FACILITY_ID
FA0006943
FACILITY_NAME
LATHROP GAS & FOOD INC
STREET_NUMBER
140
Direction
E
STREET_NAME
LATHROP
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19611007
CURRENT_STATUS
01
SITE_LOCATION
140 E LATHROP RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\140\PR0505687\COMPLIANCE INFO 1996 - 2004.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SwRC13,January 2M2 Page 7 of 9 <br /> 8. FILL RISER CONTAINMENT SUMP TESTING <br /> Fatty is Not Equipped With Fill Riser Containment Sures <br /> Fill Riser Containment Sumps are Present,but were Not Tested <br /> Test Method Developed By: © Tank Manufacture industry Standard ❑ Professional Engineer <br /> ❑ Other S a) <br /> Test Method Used: ❑ Pressure Vacuum ❑ Hydrostatic <br /> Other(Sped <br /> Test Equipment Used: Equipment Resooiution: <br /> Fill Sump# Fill Sump# Fili Sump# FIII Sump# <br /> Sump Diameter. <br /> Sump Depth: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested: <br /> Sump Material: <br /> Wait time between applying <br /> pressurelvacuumfwater and starting <br /> test: <br /> Test Start Time: <br /> Initial Pleading: <br /> Test End Time: <br /> Final Heading: <br /> Test Duration: <br /> Change in Reading. <br /> Pass/Fall Threshold or Critena: <br /> Test Result: ❑ pass r Fail Pass Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was Sensor removed for testing? ❑ Yes ❑ No ?1 NA G Yes ❑ No ❑ NA 0 Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> Was sensor property replaced and <br /> erifaed functional atter testing? ❑ Yes ❑ No ❑ NA C Yes ❑ No © NA ❑ Yes 0 No ❑ NA ❑ Yes El No L2 NA <br /> Comt xmb—(Include in armayon on re irs made prfor to telling,and recommended follow_er�rLar foded tests) --_^ <br />
The URL can be used to link to this page
Your browser does not support the video tag.