Laserfiche WebLink
0 <br /> SWRCS,January 2942 <br /> Page 9 of 9 <br /> 9, SPILLIOVERFILL CONTAINMENT BOXES <br /> ;Facility is Not EquieRed With S ill/Overfill Containment Boxes <br /> Spilt/Overfill Containment Boxes are Present,but were Not Tested q <br /> Test Method Developed By: ❑ Piping Manufacturer r` Industry Standard D Professional Engineer <br /> F, Other(Specify) <br /> Test Method Used: ❑ Pressure Vacuum r'' Hydrostatic <br /> ❑ Other(Speqjf <br /> Test Equipment Used: fncon TS-STS Equipment Resolution: 0.0001 <br /> S iH Box# Fill 87 $ ill Box# VR 87 S ilf Box# Siff Box# <br /> Bucket Diameter: 22" 1 z. <br /> Bucket Depth: 15" 12." <br /> Wait time between applying <br /> pressurelvacumelwater and <br /> starting test: 15 min 15 min <br /> Test Start Time: 14:11 14:11 <br /> Initial Reading: 5.3126 3.2152 <br /> Test End Time: 14:27 14:27 <br /> Final Reading: 5.3125 3.2144 <br /> Test Duration: 15 min 15 min <br /> Change in Reading: -0.0001 40008 <br /> Pass/Fail Threshold or Criteria: -0.002 -0.002 <br /> Test Result: r" Pass ❑ Fail d Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Comments—(include information on':c airs made prior to testing and recommended�o•llow-up for failed tests) <br />