Laserfiche WebLink
` SWiRCfl,January 2002 Page 8 of 9 <br /> 9. SPILUOVERI=ILL CONTAINMENT BOXES <br /> Facility is Not Equipped With S illf0verfill Containment Boxes L <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested CI <br /> Test Method Developed By- ❑ Piping Manufacturer v Industry Standard ❑ Professional Engineer <br /> ❑ Other S c J <br /> Test Method used: ❑ Pressure ❑ Vacuum Hydrostatic <br /> ❑ Other S ci <br /> Teat Equipment Used: tncon TS-STS <br /> EquijUent Resolution. : 1.._0001 <br /> Spill Box# Fill 91 Spill Box# VR 91 Spill Box# Fm 89 Spill Sox# VR 89 <br /> Bucket Diameter: 22" 12" 22" 12" <br /> Sucket Depth: 15' 12 15" 1z, <br /> Wait time between applying <br /> pressurelvacumetwater and <br /> starting test: 15 min 15 min 15 min 15 min <br /> Test Start Time: 13.11 13:34 17:02 17:02 <br /> Initiaf Reading: 3.2463 4.5821 5.227 2.7048 <br /> Test End Time: 13:26 13:49 17:17 17:17 <br /> Finaf Reading: 3.2472 4.5829 5.2277 2.7053 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading: 0.0009 0.0008 0.0007 0.0005 <br /> Pass/Fail Threshold or Criteria: -0,002 _Q•402 -0,002 -0.002 <br /> Fest Result: v Pass l_i Fail Pass 11 Fail Pass Fail v Pass f Fail <br /> Comments—(include information onicpaws made prior to testing.and recommended follow-up for failed tests) <br />