My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LATHROP
>
192
>
2300 - Underground Storage Tank Program
>
PR0505867
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:19 PM
Creation date
11/5/2018 4:46:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0505867
PE
2361
FACILITY_ID
FA0007059
STREET_NUMBER
192
STREET_NAME
LATHROP
STREET_TYPE
Rd
City
Lathrop
Zip
95330
CURRENT_STATUS
01
SITE_LOCATION
192 Lathrop Rd
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LATHROP\192\PR0505867\COMPLIANCE INFO 2013-2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4P TOWER ENERGY GROUP <br />Date: 02/04/13 <br />Inspector: Thuy Tran <br />San Joaquin County <br />Environmental Health Department <br />600 East Main Street <br />Stockton, CA 95202-3029 <br />Inspection Date: 01/16/13 <br />Business Name: Tower Mart 4104 <br />Business Address: 192 Lathrop Rd. Lathrop, CA 95330 <br />Contact: Paul Chevalier <br />RETURN TO COMPLIANCE <br />STATEMENT <br />UST PROGRAM INSPECTION <br />Violation: 310 Approximately '/, to 1 ballon of liquid was found in 87 Master Fill sump, <br />Diesel Fill sump and 3 cups of liquid in Diesel STP sump seen during annual compliance <br />testing. <br />Corrective Action: Walton technician corrected issue on site by removing liquid and placed <br />into facilities hazardous waste drum. On 1-22-13 Walton Engineering installed a new <br />sump lid on the 87 Satellite Tank STP Sump to prevent more surface water from entering <br />the sump. <br />Also Walton Engineering will be completing a survey onsite 2-5-13 to determine options to <br />prevent future liquid intrusion in diesel as well.. <br />Violation: 204 Designated Operator (DO) failed to document elate of alarm. <br />Corrective Action: Going forward the D.O. will ensure that all alarms are documented <br />properly by reviewing the alarm history and making sure each alarm is documented with <br />correct date of alarm and including all required information on the reports. <br />Violation: 204 Designated Operator (DO) failed to document correct test dates <br />Corrective Action: Going forward the D.O. will ensure that all test dates are correct by <br />reviewing test report that is in the Compliance Book and/or calling the Compliance <br />Specialist for the correct date if necessary so that it can be correctly documented The dates <br />on the Janualy 2013 October -November 2012 reports has been corrected onsite. <br />Tower Energy Group � 20 Goldenland Court - Sacramento, CA, 95834 <br />
The URL can be used to link to this page
Your browser does not support the video tag.