Laserfiche WebLink
KEY NOTE SCHEDULE <br /> WHA WATER HEATER SIZING CALC ULl, i GENERAL NOTES 4 e� <br /> OI I" CW w/ SOY IN BOX w/ LID MARKED "WATER". r N �!N <br /> I. COMBUSTIBLE LIQUID PIPING, VALVES, FITTINGS AND RELATED COMPONENTS DEMAND 22.0 FL. / 16ID G.P.M. m .03'3,.0 <br /> FIXTURES NO UNITS x GPH TOTAL GPH SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED ENGINEERING 2" yR <br /> 110' WATER STANDARDS. CFC 3403b2. 1 5 O2 4" W WITH 2-WAY CLEANOUT. EXIT INVERT ELEVATION • 44.80 <br /> LAVATORY 2 x 4 8 Ib WITH FINISHED FLOOR AT 4'180. DEMAND • 24.0 F.U. We W <br /> SINK 3 x 5 15 2. UNLESS BEING TESTED IN ACCORDANCE WITH THE APPLICABLE SECTION OF 0 <br /> CLOTHES WASHERI x I5 15 ABME B3I.9, PIPING, BEFORE BEING COVERED, ENCLOSED OR PLACED IN USE, r , ,_ , - , — 3" W WITH 2-WAY CL€ANOUT. EXIT INVERT ELEVATION 4580 '"' <br /> TOTAL 38 SHALL BE HYDROSTATICALLY TESTED TO 150 PERCENT OF THE MAXIMUM -� / '- - -=9 �., ®WITH FINISHED FLOOR At 4180. DEMAND • 4.0 F.U. 2a� ci <br /> ANTICIPATED PRESSURE OF THE SYSTEM, OR PNEUMATICALLY TESTED 70 110 3 STORM <br /> CALCULATING THE BTU (BRITISH THERMAL UNIT)FOR KITCHEN GAS WATER HEATER: PERCENT OF THE MAXIMUM ANTICIPATED PRESSURE OF THE SYSTEM, ENJT N07 BASEMENT I 2 Hv 1 1 /�. ib 0 O3 -------- NOT USED -------------------------- = 3 3 x <br /> LESS THAN 5 POUNDS PER SQUARE INCH GAUGES AT THE HIGHEST POINT OF - Ili <br /> 8101 <br /> THE SYSTEM. THIS TEST SHALL BE MAINTAINED FOR A SUFFICIENT TIME PERIOD -' i i 3j„ - 4 6" FIRE SPRINKLER RISER REFER TO DETAIL: <br /> 38 GPH x (110-60) DEGREES RISE x 833• 15821 BTU TO COMPLETE VISUAL INSPECTION OF JOINTS AND CONNECTIONS. FORA $ I �, a AIR PI,1 z <br /> MINIMUM OF 10 MINUTES, THERE SHALL BE NO LEAKING OR PERMANENT ____________________ _____________-__ s ; € <br /> 5O gMi <br /> - -- NOT USED ---------- o_ <br /> 15821 BtU I WATT KW DISTORTION. PIPING SHALL BE TESTED INDEPENDENT FROM TANKS. CLEARLY 3 8 <br /> 3A1.3 BTU 1000 WATT 4b4 KW IDENTIFY TESTING REQUIREMENTS FOR COMBUSTIBLE LIQUID PIPING PER CFG I4 - ' _ 14 - II 13 © /a Cp pN 7HRU ROOF. REFER TO PIPE I 4 <br /> 34063. 2 W PENETRATION AND CONDENSATE TRAP DETAILS: PS2 PS2 0 <br /> THE GAS H07 WATER HEATER WITH AT LEAST A RATING OF 4b4 KW 3. STATIONARY ABOVE-GROUND TANKS SHALL BE EQUIPPED WITH EMERGENCY <br /> VENTING THAT WILL RELIEVE EXCESSIVE INTERNAL PRESSURE CAUSED BY 'p AIR I 15 II @ X34" AIR ®3/4" CD SPILLING: TO CONDENSATE PUMP WHERE IT WILL BE PUMPED <br /> USE STATE INDUSTRIES GS6 40 YOCT INPUT • 40000 BTU EXPOSURE TO FIRES. CLASS I, II R IIIA LIQUIDS SHALL NO DISCHARGE INSIDE 'I¢f/1 11 INTO CEILING: SPACE 84E� IT SHALL DRAIN BY GRAVITY TO <br /> N <br /> BUILDINGS. VENTS, TO BUILDING EXTERIOR, SHALL BE PER 34042.1.4, NEPA - I 3/4AIR '3/4" AIR SINK TAILPIECE. <br /> 304252. W OIL:+ W OIL 21 L. 1 3r4" AIR <br /> PLANT UNDER HECK V AND EMERGENCY E SYSTEM <br /> P REFER AND <br /> 3j4 AIR 3, " /4 AIR S 34" AIR OO F2D-I (ON ROOF ABOVE) w/ 3" RWL t 3" OF LINES. 9 <br /> ' •� REFER TO DETAIL: P82 <br /> CONDI <br /> 4. PIPING SYSTEM SHALL CONTAIN A SUFFICIENT NUMBER OF MANUAL CONTROL W OIL I I W OIL 12 a_ 22 <br /> a AIR° <br /> VALVES AND CHECK VALVES TO OPERATE SYSTEM PROPERLY AND PROTECT -...,...--- <br /> PIPING DIAGRAM ON SHEET P5.1 FOR REQUIRED VALVING. � AIR L ®3" RUL. DOWN IN WALL FROM ROOF DRAIN. PROVIDE w/ WCO a a <br /> 13ra" AIR AND EXTEND OUT 5'-0" FOR CONNECTION BY CIVIL. I0 <br /> _ _ fER 70 DETAIL: P82 W � <br /> I" W OIL `-€�-1 I' W OIL Q 0 <br /> QI 3/411 AIR I" AIR ®4" RUL. DOLLN IN WALL FROM ROOF DRAIN. PROVIDE w/ WCO J <br /> I" W OIL D AND EXTEND OUT 5'-0" FOR CONNECTION BY CIVIL. LLI <br /> 3/4" AIR REFER TO DETAIL: li P81 <br /> I I O9 SPILL 3" OF. tHRU WALL PROVIDE ESCUTCHEON AND <br /> siN <br /> AND SEAL WATER TIGHT. Z & 8 <br /> 10 SPILL 3/a" CD DOLLN WALL TO BINK TAILPIECE. REFER TO Q UP o W <br /> a s -NORTH- <br /> DETAIL' PS2 o ° " <br /> PLUMBING [BASEMENT FLOOR PLAN <br /> SCALE: 19"•i'-0" —� ®SETALIL4" GD TO RAINWATER DOLLNSPOUT. REFER TO <br /> PS2 <br /> Ono <br /> II 5'n" OIL LIN€ OUTLET FROM TANK PROVIDE 3/4" AIR TO PUMP. <br /> 1 Q 12 k2" ATF LINE OUTLET FROM TANK PROVIDE 3/4" AIR TO PUMP. mt Q <br /> - - - - - - -�� - - - - - - 1 <br /> 13 I" WASTE OIL LINE INLET FROM TANK PROVIDE 3/a" AIR 70 PUMP. in %V t- } <br /> PROVIDE 3/4" AIR OUTLET. Z Z <br /> ROUTE (1) L'a" Am C4) 3/n" OIL, AND lU 3/4" AIR LINE UP !1/ -1 U <br /> �./ .). - llldld THRU OPENINGS WITHIN BASEMENT CEILING. ll- <br /> _ l 4 � } <br /> �2 Ib 3" SUM M DISCHARGEWITH S.O.V. VALVEV .Z <br /> .., r _., _ '"� -I VR 1 - 3/a AIR - _ g ON RISE DISCHARGE LINETORAISE VERTICALLY AND DRAIN (� <br /> -- r - -- - OTAIR r� „- _ =1 °/n" OIL BY GRAVITY INTO STOW SYSTEM. EXTEND V-0" FROM L/- <br /> 1�2 ' VRA --�. _ _� I. ," _ <br /> _ k _ l4 i + t t T✓n" OIL BUILDING FOR CONNECTION BY OTHERS. 'at a <br /> 45 <br /> 2" W ___ , 14 �'n° OIL <br /> V ' TP ® _ _ r_' _ <br /> 11/2" HV Ll L --- 103 L 4 r J I 1 8 1 9 1 0 1 " ATF I Q 11 SP-I. REFER TO DETAIL: PS2 <br /> I -J 7P J �- -------- 31 E3-------- -f3 4 �L 4 PZ3 18 PROVIDE I" WASTE OIL CONNECTION WITH QUICK COUPLER <br /> VCO—<}-�.: — -- — — — — — �I BINO6 Cµ� 14 3 I \ 14 <br /> J Ire � r -I-1 T-I-1 r-I--1 1 106 I 23 o . 19 PROVIDE %/ ' WASTE OIL OUTLET. <br /> �I I I r-r 34" AIR 3r " AIR . `. . ( PO mii DE •Po" OIL INLET TO STORAGE TANK <br /> FINISHED FLOOR 107 /a i0 <br /> i ' ' ELEVATION 41801 <br /> jl Ij t t l ��" TIP I I I 3q" AIRgj 21 PROVIDE V2" ATF INLET TO STORAGE TANK <br /> '' dw I ( 3/4 cW 3/2 ( vz a <br /> I --II II L_I_ J L_I_J E$ I J ip " HV I AREA " _ - -- - GW-- - -- ,.k 22 PROVIDE P/a" AIR CONNECTION TO AIR COMPRESSOR. <br /> --- ---- Fc0 i� oWOMIN "1 > <br /> 2 <br /> 1 II II - O FI-057 VR ( l I QPROVIDE (1) 34 AIR, (4) 3/n OIL, (U I/2" ATF 4 (1) ti OW LINES TO <br /> 102 _. • OVERHEAD REELS <br /> {I III II r - - - C� 4 PROVIDE (1) I/a" ATF, (4) " OIL, AND (I) I" WASTE OIL CONNECTIONS ON <br /> WD REFER TO PIP£ <br /> _-. ) _ _ _ - SU�ORT - - _ .._ _ _ _ _ D OUTSIDE OF BUILDING R REFILL OF STORAGE TANKS IN BASEMENT. .� <br /> - - - - - -_._— - - DETAIL - - — <br /> \ ©5 ROUTE (U U2 ' ATF, (4) 9'n" OIL, AND CV I" WASTE OIL LINE UP ac <br /> TNftU OPENINGS WITHIN BASEMENT CEILING: PROVIDE CHECK VALVE Y--i <br /> PS2 NOTE: AT POINT OF FILL, <br /> 1. COORDINATE ORDER OF PIPING WITH ©CONTROL PANEL FOR.0,-1 <br /> 2 OWNERS REPRESENTATIVE PRIOR TO <br /> INSTALLATION. <br /> 1 2. PLUMBING CONTRACTOR SHALL REVIEWm i_ <br /> 1 2 3 4 ADEQUACY OF THE PIPE SIZING WITH THE 5 <br /> OIL TANK SUPPLIER TO ENSURE ADEQUATE QI A <br /> PdUMBONG FIR87 FLOOR PLANSIZING WITH PROPOSED EQUIPMENT. -NORTH- <br /> SCALE: Ire11•1'-0" " ^' <br /> ^O <br /> �V b <br /> `- <br /> N 9 aA <br /> 21, VR b <br /> 99} 3" OF. - �, _ _ - _I - GENERAL NOTES ,� wct A <br /> o - \ 1 3RIUL- _ - - - - �1 -RIUL t' µ 3" RAUL. -RIUl.. .L <br /> r J <br /> 3' OF. 18 VR . ". .:I, `1 , VTR 4 �`_... <br /> of II/jn YR-->- 1 `� 3 OF. <br /> Hy \ I.) PLUMBING CONTRACTOR TO COORDINATE ROUTING OF <br /> RUL. . /- J <br /> 2„ VTR PLUMBING SERVICES w/ MECHANICAL, ELECTRICAL, FIRE <br /> AND GENERAL CONTRACTOR TO ELIMINATE ANY SPACE <br /> CONFLICTS. <br /> cw REFER TO �' � I // <br /> PIPE HANGER ��-q` //�.�)— II � 1 2.) REFER TO FIXTURE CONNECTION SIZE SCHEDULE SHEET Fi <br /> 3 S FIXTURES. <br /> P821L. IR DETAIL: I_Vj��1 ,I'/2" VTR-1/ \ i Iii HV 3.) FREPER TOR O PLTUMBING LEGEND ON SHHEION SIZES TO THE ETfi FOR SYMBOLS. li <br /> PS2 I L��VJ�J ( I I _ r 4.) REFER TO ARCHITECTURAL DWGS FOR MOUNTING HEIGHTS <br /> I OF ALL FIXTURES. <br /> •= b i i ! 5.) ALL VENTS ARE TO BE LOCATED A MINIMUM OF 10'-0" AWAY <br /> STORAGE I 1'/2" VR FROM OUTSIDE AIR INTAKE. <br /> K <br /> o x 201 " .' n . .. i .... .. � li ��C ' <br /> I,,.I _I .. ' _.. I •3 VTR - .:..- _ :::_ .) REFER TO SPECIFICATION SHEET FOR PIPE MATERIAL. <br /> _ _ 6 <br /> U _ <br /> w C _ _ = �._ :? i t `r z . DATE <br /> 01/13/10 <br /> \ DRAWN BY <br /> D --"' ALEXANDER SCHEFLO S. PRUITT <br /> EA. G,,,. and ASSOCIATES Inc. CHECKED BY <br /> A'S <br /> / 2 ,1, c'yY ^, + M.SCHEFLO <br /> a Ay ti° T Mechanical Engineers (209) 948-9781 <br /> P23 i o 2928 Pacific Ave. Stockton, Ca. 95204 JOB NO. <br /> m M 025588 09084 <br /> Fxp. 9-30-10 ALL DRAWINGS AND WRITTEN MATERIAL APPEARING HEREIN <br /> I1 1�11p1��//11 �N(� [�F�/� ((��111 FLOOR <br /> 11 X11 -NORTH- �9 CHANK' Qom\ ENGINEERCONSTITUAND THE E THE RIS TAME MAY NOT BENAL AND UUSED. DUPUCATED.SHED WORK OF EOR <br /> 3 <br /> PLUMBING M D ING 3ECOUV D FL OOR Pl5AI1V ^ lF pF CAL�E� DISCLOSED WITHOUT THE WRITTEN CONSENT OF THE ENGINEER. P2 . 1 <br /> 4b; c Alexander Schel7o & Assoc., Inc <br /> ,;) OF X SHEETS <br />