Laserfiche WebLink
This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Mete the fnllbwiu checklist: <br /> (z)Yes ❑ Nu* Has all input wiring been inspected for proper entry and ten nination, including testing for ground faults? <br /> ( )Yes ❑ Nn* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ( )Yes ❑ No* Was accuracy of system product level readings tested? <br /> ( )Yes No* Was accuracy of system water level readings tested? <br /> ( )Yes L7 No* Were all probes reinstalled properly? <br /> ( )Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklistcompleted? <br /> * In the Section H,below,describe how and when these deficiencies were or will he corrected. <br /> G. Linc Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> O Ycs ❑ No" For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance <br /> ❑ N/A (Check all that apply) Simulated leak rate: IR 3 g.p.h.; ❑0.1 g.p.h ; ❑0.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes 4 NO Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> q Yes ❑ No's For electronic LLDs, does the turhine automatically shutoff if the LLA detects a leak? <br /> N/A <br /> Q Yes ❑ No" For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> D N/A or disconnected? <br /> ❑ Yes ❑ No" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> M N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> D Yes J NO Were all items on the equipment manufacturer's maintenance ch:cklist completed? <br /> " In the Section H, below,describe how and when these dericicncies were or will be corrected. <br /> H. Comments: Found that the leak detector for the line coming from the turbine on Tank 96 was <br /> failing. Replaced leak detector with inspector on site and re-tested new leak detector. All lines <br /> now passing. <br /> New leak detector: Fe-Petro STP-MLA <br /> WUnitnrine 8yvtem certoical'lon Nee 4 nt4 12107 <br />