My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010-2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LINDSAY
>
1533
>
2300 - Underground Storage Tank Program
>
PR0231158
>
COMPLIANCE INFO 2010-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2022 11:57:53 AM
Creation date
11/5/2018 5:15:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010-2013
RECORD_ID
PR0231158
PE
2361
FACILITY_ID
FA0003749
FACILITY_NAME
SJ REGIONAL TRANSIT
STREET_NUMBER
1533
Direction
E
STREET_NAME
LINDSAY
STREET_TYPE
ST
City
STOCKTON
Zip
952054498
APN
15302004
CURRENT_STATUS
02
SITE_LOCATION
1533 E LINDSAY ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LINDSAY\1533\PR0231158\COMPLIANCE INFO 2010-2013.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com Mete the fnllbwiu checklist: <br /> (z)Yes ❑ Nu* Has all input wiring been inspected for proper entry and ten nination, including testing for ground faults? <br /> ( )Yes ❑ Nn* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ( )Yes ❑ No* Was accuracy of system product level readings tested? <br /> ( )Yes No* Was accuracy of system water level readings tested? <br /> ( )Yes L7 No* Were all probes reinstalled properly? <br /> ( )Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklistcompleted? <br /> * In the Section H,below,describe how and when these deficiencies were or will he corrected. <br /> G. Linc Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> O Ycs ❑ No" For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance <br /> ❑ N/A (Check all that apply) Simulated leak rate: IR 3 g.p.h.; ❑0.1 g.p.h ; ❑0.2 g.p.h. <br /> ® Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ® Yes 4 NO Was the testing apparatus properly calibrated? <br /> Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> q Yes ❑ No's For electronic LLDs, does the turhine automatically shutoff if the LLA detects a leak? <br /> N/A <br /> Q Yes ❑ No" For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> D N/A or disconnected? <br /> ❑ Yes ❑ No" For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> M N/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> D Yes J NO Were all items on the equipment manufacturer's maintenance ch:cklist completed? <br /> " In the Section H, below,describe how and when these dericicncies were or will be corrected. <br /> H. Comments: Found that the leak detector for the line coming from the turbine on Tank 96 was <br /> failing. Replaced leak detector with inspector on site and re-tested new leak detector. All lines <br /> now passing. <br /> New leak detector: Fe-Petro STP-MLA <br /> WUnitnrine 8yvtem certoical'lon Nee 4 nt4 12107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.