My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1986
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
2300 - Underground Storage Tank Program
>
PR0232423
>
REMOVAL_1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2019 11:50:05 AM
Creation date
11/5/2018 5:51:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1986
RECORD_ID
PR0232423
PE
2381
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\204\PR0232423\1986 REMOVAL.PDF
QuestysFileName
1986 REMOVAL
QuestysRecordDate
4/27/2016 5:02:19 PM
QuestysRecordID
3068866
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Martin Thorpe ��/�/�/�■ <br /> weissnssocu7Fs <br /> 16 October 1987 g i L 1 <br /> SUBSURFACE CONDITIONS <br /> Soils beneath the site consist predominantly of silts and sands of <br /> moderate to high estimated permeability, with occasional interbeds of clays <br /> and silts of low estimated permeability. Although minor variations in soil <br /> composition and unit thickness are seen between borings, there is generally <br /> good stratigraphic correlation across the site. Ground water was encountered <br /> during drilling at approximately 50 ft below ground surface. Boring logs are <br /> included as Attachment C. <br /> MONITORING WELL INSTALLATION <br /> Monitoring wells were installed on 23 July 1987 by EGS and Spectrum <br /> - Exploration of Stockton, California under the supervision of WA geologist <br /> Joseph Theisen. MW-1 was drilled to a total depth of 71.5 ft and was <br /> completed to a depth of. 65 ft. This well monitors ground water adjacent to <br /> and beneath the tank excavation. MW-2 was drilled to a total depth of 65.5' <br /> ft, was completed to 60 ft and monitors ground water southwest of the tank <br /> excavation. MW-3 was drilled to a total depth of 65.5 ft and was . completed. to <br /> a depth of 59 ft. This well monitors ground water between the tank excavation <br /> and the City of Lodi municipal well. <br /> Monitoring wells were constructed of 4-in. ID factory-threaded Schedule <br /> 40 PVC casing and screen and were screened from 10 to 13 ft above the static <br /> water level to allow for seasonal ground water fluctuations. To prevent <br /> surface infiltration into the wells, a 1-1/2 ft bentonite seal was placed in <br /> the annulus above the sand pack and the remaining annulus was then filled with <br /> neat cement grout to the ground surface. Placement of the grout was witnessed <br /> by Dan Guerra of the SJLHD. <br /> WELL DEVELOPMENT AND WATER SAMPLING <br /> Monitoring wells were developed on 11 August 1987 by airlift evacuation. <br /> A total of 240 gallons were withdrawn from the three wells. Approximately 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.