Laserfiche WebLink
' STATE OF CALIFORNIA �' <br />STATE WATER RESOURCES CONTROL BOARD W`y <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B ��4FF,..��� ° <br />a Y/� 0 <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. ��1��""� <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT ❑ <br />5 CHANGE OF INFORMATION <br />a <br />7 PERMANENTLY CLOSED ON SITI <br />ONE REM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT ❑ <br />6 TEMPORARY TANK CLOSURE <br />❑ <br />6 TANK REMOVED L <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />S,670 1-&4 ( <br />A✓A�- <br />❑ 7 METHANOL <br />❑ 3 CHEMICAL PRODUCT <br />I TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br />A. OWNEWS TANK I. D.a <br />1- <br />B. <br />B. MANUFACTURED BY: -"'7d <br />I. REGULAR <br />C. UNLEADED <br />3 DIESEL <br />C. DATE INSTALLED(MOADAYHEAR) <br />❑ ROLEUM <br />�/J`O>/ a/f <br />D. TANK CAPACITY IN GALLONS: <br />� PRODUCT <br />II.TANKCONTENTS IFA -1 IS MARKED. COMPLETE ITEM C. <br />A 1 MOTOR VEHICLE FUEL <br />❑ 4 OIL <br />B. <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />I. REGULAR <br />C. UNLEADED <br />3 DIESEL <br />❑ 6 AVIATION GAS <br />❑ ROLEUM <br />❑ 60 EMPTY <br />❑ 99 OTHER <br />� PRODUCT <br />❑ 1 PREMIUM <br />A GASALKIL <br />❑ 7 METHANOL <br />❑ 3 CHEMICAL PRODUCT <br />❑ 95 UNKNOWN <br />❑ 5 CONCRETE <br />❑ 2 WASTE <br />UNLEADED <br />❑ 2 LEADED <br />5 JET FUEL <br />99 OTHER (DESCRIBE IN ITEM O. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED tfpC. <br />❑ 9 BRONZE <br />❑ 10 GALVANIMD STEEL <br />A S. v: <br />❑ 99 OTHER <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. B. AND C. AND ALL THAT APPLIES IN BOX D AND <br />A. TYPE OF <br />SYSTEM TYPE <br />1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />A U 99 OTHER <br />2 SINGLE WALL <br />❑ ♦ SECONDARY CONTAINMENT (VAULTEDTANK) <br />❑ 99 OTHER <br />A®2 DOUBLE WALL A U <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />A STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 8 POLYVINYL CHLORWE <br />❑ 7 ALUMINUM <br />❑ 6 10016 METHANOL COMPATIBLE WIFRP <br />(PrimaryTank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIMD STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LNWGn <br />3 EPDXY LINING <br />❑ A PHENOLIC LINING <br />C. INTERIOR <br />5 GLASS LINING <br />❑ 6 UNLINED <br />95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES_ NO— <br />D. CORROSION <br />❑ I POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ S CATHODIC PROTECTION <br />❑ 91 NONE <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR <br />OVERFILL PREVENTION ECUIPMENT INSTALLED (YEAR) <br />IV, PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />A 6Y2 PRESSURE A U <br />3 GRAVITY <br />A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A®2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U W OTHER <br />C. <br />MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />S ALUMINUM <br />9 GALVANIZED STEEL <br />A U 2 STAINLESS STEEL A U <br />A U 6 CONCRETE A U <br />A U 10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 6 FIBERGLASS PIPE <br />7 STEEL W/ COATING A U 6 100% METHANOL COMPATIBLE W/FRP <br />A U 95 UNKNOWN A&9 OTHER FOjT' <br />D. <br />LEAK DETECTION <br />❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTINGMONITORING <br />❑ 99 OTHER <br />V. TANK LEAK DETECTION <br />❑ 1 VISUAL CHECK E,.�7,, ))2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ A AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br />❑ 6 TANK TESTING }/7 INTERSTITIALMOMTORING ❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED(MO/DAY/YR) 2. ESTIMATED DUMMY OF 3 WAS TANK FILLED WITH YES ❑ NO❑ <br />SUBSTANCE REMAINING GALLONS I INERTMATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRECT <br />APPLICANT'S NAME DATE <br />IPRI T P 6 SIGNATURE) <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />FORM B (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPUCATION - FORMA, UNLESS A CURRENT FORMA HAS BEEN FILED. <br />0 <br />0 <br />FORMBAS <br />COUNTY It JURISDICTION # <br />FACILITY # TANK # <br />� <br />STATE I.D.# <br />2j� <br />f <br />y <br />l qb <br />PERMITNUMBER <br />PERMIT APPROVED BY/DATE <br />I PERMIT EXPIRATION DATE <br />FORM B (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPUCATION - FORMA, UNLESS A CURRENT FORMA HAS BEEN FILED. <br />0 <br />0 <br />FORMBAS <br />