My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:07:04 PM
Creation date
11/5/2018 5:52:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\2500\PR0231356\BILLING 1985-1997.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OFCAUFORNIA • ° °° <br />s <br />STATE WATER RESOURCES CONTROL BOARD ice' 3 <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION -FORMB "� <br />a Y / � <br />C <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION <br />B. MANUFACTURED BY: i/�� n� ( „ <br />I i <br />7 PERMANENTLY CLOSED ONSITE <br />ONE REM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE <br />❑ <br />6 TANK REMOVED O <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />5dv f -v _ <br />��II PRODUCT <br />❑ <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK 1.0.0f -- JG <br />❑ 6 OIL <br />B. MANUFACTURED BY: i/�� n� ( „ <br />I i <br />C. DATE INSTALLED(MOIDAYNEAR) d/3 <br />1a REGULAR <br />D. TANK CAPACITY IN GALLONS: 6 truCJ <br />ILTANKCONTENTS IFA-11SMARKED.COMPLETE(TEMC. <br />A MOTOR VEHICLE FUEL <br />❑ 6 OIL <br />8. <br />C. ❑ <br />1a REGULAR <br />❑ 2 SINGLE WALL <br />DIESEL <br />❑ 6 AVIATK)N GAS <br />❑ 2 PETROLEUM <br />❑ BO EMPTY <br />��II PRODUCT <br />❑ <br />UNLEADED <br />lb <br />DUN ELEMIUMADED <br />B. TANK <br />MATERIAL <br />• GASAHOL <br />❑ 7 METHANOL <br />❑ 7 ALUMINUM <br />❑ 9 100% METHANOL COMPATIBLE WIFRP <br />4N WASTE <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />5 JETFUEL <br />LEAK DETECTION <br />❑ 3 CHEMICALPRODUCT <br />❑ 95 UNKNOWN <br />❑ <br />❑ <br />2 LEADED <br />❑ 5 GLASS LINING <br />99 OTHER (DESCRIBE <br />IN ITEM 0. BELOW) <br />D. IF (A.I) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED <br />LINING <br />C. A. S. v: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B. AND C. AND ALL THAT APPLES IN BOX D AND <br />A. TYPE OF <br />r=Kl DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR UNER <br />❑ 95 UNKNOWN <br />SYSTEM <br />❑ 2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (VAULTED TANK) <br />❑ 99 OTHER <br />B. <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />❑ 3 FIBERGLASS <br />4 STEEL CLAD Wl FIBERGLASS REINFORCED PLASTIC <br />B. TANK <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 8 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 9 100% METHANOL COMPATIBLE WIFRP <br />(PrimaryTank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />LEAK DETECTION <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />95 UNKNOWN <br />❑ 99 OTHER <br />LINING <br />IS LINING MATERIAL COMPATIBLE WITH 1005: METHANOL? <br />YES_ NO <br />O.CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />"Cu FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE <br />❑ 95 UNKNOWN <br />= 999 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) <br />OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. <br />SYSTEM TYPE <br />A U <br />1 SUCTION <br />Ag2 <br />PRESSURE A U <br />3 GRAVITY <br />A U N OTHER <br />B. <br />CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH <br />A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />CORROSION <br />PROTECTION <br />A U <br />A U <br />A U <br />1 BARE STEEL <br />5 ALUMINUM <br />9 GALVANIZED STEEL <br />A U <br />A U <br />A U <br />2 STAINLESS STEEL A U <br />6 CONCRETE A U <br />10 CATHODIC PROTECTION <br />3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE <br />7 STEEL WICOATING A U IOD% METHANOL COMPATIBLE WIFRP <br />A U 95 UNKNOWN ( 1 99 OTHER <br />D. <br />LEAK DETECTION <br />❑ 1 <br />AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGHTNESS TESTING fl..Uj <br />MONITORING ❑ 9B OTHER <br />V. TANK LEAK DETECTION I <br />❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUNDWATER MONITORING <br />❑ 6 TANK TESTING ❑./I INTERSTITIAL MONITORING I❑ 91 NONE ❑ 95 UNKNOWN ❑ 99 OTHER <br />1. ESTIMATED DATE LAST USED (MOIDAYIYR) I 2. ESTIMATED QUANTITY OF I S. WAS TANK FILLED WITH YES ❑ NO ❑ <br />SUBSTANCE REMAINING GALLONS INERTMATERIAL7 <br />THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE. IS TRUE AND CORRECT <br />APPLICANT'S NAME DATE <br />(PRINTED a S"A111Rq <br />LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br />COm JILLLJ FACT T <br />STATE I.D.# f 6 <br />RERMIT NUMBER PERMIT APPROVED BYIDATE PERMIT EXPIRATION DATE <br />FORM B (7.91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION • FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />0 <br />0 <br />FORMSAS <br />
The URL can be used to link to this page
Your browser does not support the video tag.