My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
2500
>
2300 - Underground Storage Tank Program
>
PR0231356
>
INSTALL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2022 11:42:14 AM
Creation date
11/5/2018 5:52:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1997
RECORD_ID
PR0231356
PE
2361
FACILITY_ID
FA0003815
FACILITY_NAME
TESORO (MOBIL) 68154
STREET_NUMBER
2500
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
02740006
CURRENT_STATUS
01
SITE_LOCATION
2500 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\2500\PR0231356\1997 INSTALL .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19 <br />Interconnecting Containment Sumps <br />After a GeoFleX Pipe section has been coupled, take the pipe section to the <br />trench and insert Into the containment sump through the Flexible Entry Boot. <br />Make sure the band clamp of the Entry Boot has been removed or sufficiently <br />loosened to permit the pipe to pass through the rubber boot. Be sure to <br />tighten the band clamp of the Entry Boots after the installation process has <br />been completed. <br />Note: Prior to connecting the Pipe Coupling to the Pipe Fitting make sure of <br />the following: (1) the Test Boots have been installed to the end of the pipe <br />section (See the Installation instructions below.) <br />Sump <br />Rog <br />Installing Crossover Supports <br />Crossover Supports should be used at all flexible piping crossovers and <br />installed over the flexible piping at any rigid piping or conduit crossovers. <br />These two piece supports are installed to both the upper and lower flexible <br />pipe sections. They must be installed before backfill begins. They are <br />designed to provide a flat crossover surface for the upper pipe and also <br />allow for even backfill compaction around both flexible pipes. <br />To install, align upper and lower support as shown in illustration and fasten <br />together using the supplied clips. Be certain not to scratch piping while <br />installing clips. <br />Installing Test Boots <br />For GBOF/ex Piping installations the Test Boots must be Installed to the ends <br />of each flexible pipe section In order to provide a means of air pressure <br />Integrity testing the Interstitial space of the flexible pipe. After all pipe <br />sections have been inserted into the containment sumps and before Pipe <br />Couplings are connected to the Pipe Fittings or Pipe Adapters, the Test <br />Boots should be installed. The Test Boot has an outlet opening located on <br />the bottom for connection of the Connector Tubes and Test Tubes which are <br />used for performing an air pressure integrity test as described on page 22 of <br />this product manual. <br />Step #1 <br />Remove both band clamps from the Test Boot <br />before installing the rubber boot over the and of <br />the coupled flexible pipe section. <br />(2) If pipe crossovers are to be Included in the piping layout, the Installation <br />of the Crossover Supports should be made at this time. (See the Installation <br />instructions below.) (3) Read the "Pipe Coupling Connection" Instructions <br />carefully on the following page before any coupling to fitting or adapter <br />connections are made. <br />After one end of the flexible pipe section has been connected to a <br />containment sump take the other and of the pipe section to the next <br />containment sump in series and repeat the same connection procedure. <br />After both ends of a flexible pipe section have been connected to the <br />containment sumps, inspect the length of pipe between containment sumps <br />to make sure it is positioned property in the trench. <br />Sump <br />After integrity testing has been completed, the Test Boots can remain <br />Interconnected If product flow Is desired to run to the tank Sump. If product <br />flow is desired in all sumps then one end of the Connector Tube In each <br />)unction type Dispenser Sump should be disconnected from the Test Boot to <br />permit the Interstitial space of the GeoF/ex Piping to draln into the <br />containment sump. Comply with the following three step installation <br />procedures for proper installation of the Test Boots. <br />Step #2 <br />From Inside the containment sump install the <br />Test Boot over the installed Pipe Coupling. <br />Step #3 <br />Center the Test Boot over the end of the outer <br />containment jacket with the small outlet facing <br />downward. Then install and tighten band clamps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.