Laserfiche WebLink
Flexible Pipe Connections <br />Pipe Coupling Connections <br />After all containment sumps have been interconnected with all of the flexible pipe sections, Crossover Supports (if required) and the Test Boots have been <br />installed, then connection of the Pipe Couplings to Fittings or Adapters may proceed. Comply with the following connection procedures for profiler Installation. <br />Step #1 <br />Step #2 <br />Step #3 <br />Step #4 <br />Remove the protective cap from the <br />Remove the plastic protective cap <br />Push the Pipe Coupling onto the <br />Using two Swivel Wrenches, tighten <br />Pipe Coupling and verify that the <br />from the Filling or Adapter. Inspect <br />male threaded Fitting or Adapter and <br />the coupling to 60 ft. Ibe.. It is not <br />Gasket is seated in the back of the <br />the Fitting or Adapter to be sure that <br />hand tighten. Be sure that the piping <br />necessary to use a wrench <br />swivel. Insure that the Test Boot <br />it is free of sand or debrls. <br />does not twist while hand tightening. <br />extension to achieve rated torque. <br />has been properly Installed as <br />When completed, tighten the Band <br />outlined on page 14. <br />Clamps on the Flexible Entry Boots. <br />Test Boot Connections <br />In order to perform an air pressure Integrity test on <br />the interstitial space of GeoFlex Pipe the entire <br />interstitial space must be interconnected. There <br />are two types of required connections made to the <br />Test Boots. This will vary depending on which <br />type of containment sump the Test Boot is <br />installed. <br />Standard Connector Tubes <br />These nylon lubes are 12` (300mm) in length and <br />fitted at each end with a nylon speared elbow. <br />Each comes with two stainless steel band clamps. <br />F <br />Test Tubes <br />These nylon tubes are 36" (900mm) in length and <br />fitted on one end with with a nylon speared elbow <br />and the other end with 1/4' NPT threaded lining. <br />Each comes with one stainless steel band clamp. <br />Custom Connector Kits <br />For custom length connector tubes a kit containing <br />a 50' (15.24m) roll of nylon tubing, with 50 nylon <br />speared elbows, and 100 stainless steel band <br />clamps is available. Custom lengths can also be <br />made upon request. <br />Interconnecting Test Boots <br />Tank Sump Connections <br />Test Boots installed in these sumps should be <br />connected to the 36" (900mm) long Test Tubes. <br />The fitting on the end will accept the Test Gauge <br />used for air pressure testing. <br />Manifold Sump Connections <br />Test Boots installed in these sumps should be <br />Inter -connected with a custom length Connector <br />Tube:' <br />In-line Piping Sump Connections <br />Test Boots installed in these sumps should be <br />inter -connected with a custom length Connector <br />Tube. <br />Junction Dispenser Sumps <br />Test Boots installed in these sumps should be <br />inter -connected with the 12" (300mm) long <br />standard Connector Tubes. <br />Terminating Dispenser Sumps <br />Test Boots installed in these sumps should be <br />connected to the 36" (900mm) long Test Tubes <br />and plugged on the end when conducting the air <br />pressure test. <br />