Laserfiche WebLink
TY NAME: <br />NEW UST INSTALLATION INSPECTION RECORD <br />ADDRESS: <br />FPti ILITY ID# TANK# UL# TANK MODEL/MATERIAL: <br />(CAPACITY: PRODUCT: R.E.H.S: 9 <br />IMUFAMIMug"60U <br />A <br />I <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />P <br />N <br />I <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />R <br />T <br />NUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />0 <br />I <br />VERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />V <br />A <br />LL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />E <br />L <br />12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br />D <br />S <br />20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />' <br />DATE <br />ITEM OR EQUIPMENT INSPECTED <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />2. UST INSTALLATION PLANS APPROVED <br />IMUFAMIMug"60U <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />ECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />AKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />IMUFAMIMug"60U <br />RIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) (CCR 2636 (e)) <br />ECONDARY PIPING CONTAINMENT TEST PSI: HRS/MIN: OTHER: (CCR 2636 (e)) <br />1p <br />AKE TEST ON ALL SUMPS (24 HR. MINIMUM) HRS: (CCR 2635 (a) (4)) <br />NUSED TANK OPENINGS SEALED AND CORROSION PROTECTED PEI <br />VERSPILL PERFORMANCE TEST (CCR 2635 (b) (1) (C)) <br />LL PIPING AND FITTINGS CORROSION PROTECTED (CCR 2636 (b)) <br />12. PIPING SLOPES TO COLLECTION SUMP (CCR 2636 (c)(1)) <br />IMUFAMIMug"60U <br />EH23-006 7/97 <br />10 <br />13. PERFORMANCE TEST FOR "ALL" MONITORING PROBES (CCR 2632 (c) (2)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />15. PERFORMANCE TEST OF LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />16. PERFORMANCE TEST OF AUTOMATIC PUMP SYSTEM SHUT-OFF (LCR 2636 (g)) <br />17. BALL FLOAT VALVES INSTALLED <br />18. OVERFILL PROTECTION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />19. TANK ACCESS PORTS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />20. TANK INTEGRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />EH23-006 7/97 <br />10 <br />