Laserfiche WebLink
USA PETROLEUM CORP <br />1261 E. 9TH STREET, POMONA, CA 91766 909/ 622-3424 EX 18 FAX: 909/622-1002 <br />DAVID IL OLDFMM: PROJECT COORDINATOR CONSTRUCTION DEPT. <br />WRITTEN MONITORING PROCEDURE <br />UNDERGROUND STORAGE TANK MONITORING PROGRAM <br />THIS MONITORING PLAN MUST BE KEPT AT SITE AT ALL TIMES. IF INFORMATION ON THIS MONITORING <br />PROGRAM ARE CONDITION OF THE OPERATING PERMIT. THIS PERMIT HOLDER MUST NOTIFY SAN JOAQUIN <br />COUNTY WITHIN 30 DAYS OF ANY CHANGES TO THE MONITORING PROCEDURES, UNLESS REQUIRED TO OBTAIN <br />APPROVAL BEFORE MAKING THE CHANGE. <br />SITE NAME: USA GASOLINE # 65 <br />SITE ADDRESS 2500 W LODI LODI CALIF. 995240 <br />A. DESCRIBE THE FREQUENCY OF PERFORMING THE MONITORING: <br />TANK: DAILY -CHECK PRINT OUT FOR ALARMS AND TANK INFORMATION <br />PIPING: CONTINUOUSLY <br />B. METHODS AND EQUIPMENT TO BE USE IN PERFORMING THE <br />MONITORING: <br />TANK:VEEDER ROOT IN TANK LEVEL GAUGE, THIS CAN BE PROGRAM <br />TO TEST TANK ONCE -A -MONTH (D! W MODERN WELDING <br />GLASSTEEL TANK ) <br />PIPING:LIOUID SENSOR INSIDE PIPING SUMP TO DETECT LEAKS <br />FROM PIPING. -SHUT DOWN OF TURBINE UPON LEAK DETECTION, <br />C, THE LOCATIONS WHERE THE VEEDER ROOT MONITORING EQUIPMENT <br />WILL BE INSTALLED, <br />TANKS: INSIDE TANK S ANNULAR SPACE,- LIOUID SENSOR #794390-420 <br />PIPING: INSIDE PRODUCT SUMPS - SHUT DOWN OF TURBINE <br />DISPENSER SUMP: LIQUID SENSOR TO SHUT DOWN TURBINE <br />D. LIST OF NAMES AND TITLES OF RESPONSIBLE FOR PERFORMING THE <br />MONITORING PROGRAM AND MAINTENANCE: <br />SUPERVISOR: IVAN SCHARTZ <br />MANAGER: <br />MAINTENANCE COMPANY: AL HUNSAKER <br />209-538-6433 <br />