Laserfiche WebLink
to <br /> • <br /> STATE OF CALIFORNIA <br /> STATE WATER RESOURCES CONTROL BOARD 4 <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br /> i <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ONSITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: 5v/ w, Gal <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNERS TANK I.D.# / B. MANUFACTURED BY: v <br /> C. DATE INSTALLED(MO/DAY/YEAR) f 9 D. TANK CAPACITY IN GALLONS: 8 <br /> II.TANK CONTENTS IFA-1 IS MARKED,COMPLETE ITEM C. <br /> ��l MOTOR A ❑ 2 PETROLEUM 80 <br /> FUEL O BO OILB. <br /> B �' 1 PRODUCT C ❑ 1e REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> 10 PREMIUM UNLEADED ❑ 4 JET FUEL ❑ 7 METHANOL <br /> 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 M85 <br /> ❑ 3 CHEMICALPRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OFSUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM L] 95 UNKNOWN <br /> SYSTEM [!� 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK f�il 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 1001/6 METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING ffi 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 10D% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,BfC. SPILL CONTAINMENT INSTALLED(YEAR) OVERRLL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO_ STRIKER PLATE YES_ NO DISPENSER CONTAINMENT YES NO <br /> IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 S//T�EE.E..L��W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION Al2:05 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION 1 MECHMIGL LINE LEAK 2 UNE NESS3 OCMINUOUS INTEPSIMAL 4 ELEMMIO LINE 5 AUfOW11C PUMP <br /> ❑ DETECTOR ❑ MIO <br /> TESTING MOMTMNG LEAK MMMOR SHOm ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK 2 MANUAL RECONCILIATION MOND[D3 VAOZEMON ORING ❑ 4 GAUGING AUTOMATIC TANK ❑5 GROUND MONITORING TER TANK <br /> 9 TESTING <br /> ❑ 7 MONITORCONTINUOUS <br /> INTERSTITIAL ❑ 8 SIR ❑ 9 WEEKLY MANUAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN ❑ 99 OTHER <br /> G TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAY/YR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES NO <br /> SUBSTANCE REMAINING GALLONS INERTMATERIAL7 ❑ ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRIMED a SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# z s zvrzh1 <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> 2/2314 <br /> THIS FORM MUST BE ACCOMPANIED BY PERMIT AP ATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PL FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE UNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6.95) 49 <br />