My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
501
>
2300 - Underground Storage Tank Program
>
PR0231358
>
BILLING_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/5/2022 2:01:43 PM
Creation date
11/5/2018 5:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
PRE 2019
RECORD_ID
PR0231358
PE
2381
FACILITY_ID
FA0003590
FACILITY_NAME
M B P
STREET_NUMBER
501
Direction
W
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
03731045
CURRENT_STATUS
02
SITE_LOCATION
501 W LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LODI\501\PR0231358\BILLING .PDF
QuestysFileName
BILLING
QuestysRecordDate
2/27/2017 10:27:28 PM
QuestysRecordID
3345159
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> STATE OF CALIFORNIA "eeo"+yea <br /> STATE WATER RESOURCES CONTROL BOARD +•• coM1'o <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B m <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE REM ❑ 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: p/ k q0 <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# ' B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) IG'-JZ D. TANK CAPACITY IN GALLONS: IDl� <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. <br /> A OR I MOTOR VEHICLE FUEL ❑ 4 OIL B, C19 REGULAR UNLEADED ❑ 3 DIESEL E] 6 AVIATION GAS <br /> F--] 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT <br /> PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 3 CHEMICALPRODUCT E] 95 UNKNOWN E] 2 WASTE ❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL ❑ 8 EMD <br /> ❑ 2 LEADED ❑ 89 OTHER(DESCRIBE IN REM D.BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A,B.AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR UNER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLEWIFRP <br /> (Primary Teck) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED ❑ 2 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING8 UNLINED El UNLINED UNKNOWN E] 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES— NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING ❑ 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION E::] 5 CATHODIC PROTECTION ❑ 91 NONE 5 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL,etc. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO_ STRIKER PLATE YES_ NO DISPENSER CONTAINMENT YES_ NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION 2 PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION 40VI SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑1 AffCKAMI UNE LFAX ❑2 UNE 1 ESS ❑3 COMINUCUS IMML O 4 EMMMIC UNE1:1 5 AUfONATIC PUMP <br /> DETECTOR TESTING MOMTC LEAK DETECTOR SHUTDOWN ❑ 99 OTHER <br /> V.TANK LEAK DETECTION �J}/p� <br /> ❑ 1 VISUAL CHECK 2 MANUAL RECONCILIATION MONITORING <br /> ❑ 3 VADOZE MONIITORING ❑ 4 AUTOMATGAUGNGIC TANK ❑ 5 GROUND WATER <br /> ` ' TESTNGTANK <br /> ❑ 7 MON TORNG INTERSTITIAL B SIR ❑ 9 WEEKLV MANUAL ❑10 MONTHLY TANK ❑ 95 UNKNOWN u 99 OTHER <br /> TANK GAUGING TESTING <br /> VI.TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE) <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNS) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH YES ❑ NO❑ <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL 7 <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRIMEO8510NANREI <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE LD:# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS.THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLWN. FILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTINLSUNDERGROUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.