Laserfiche WebLink
Feb. 4. 2009 3:46PM No. 1797 P. 3 <br /> vw� �.. <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORINGPLAN (Page2of2) <br /> QI.DNDEir+H EN9ER CONT`AINMENT'(#DO MOMTORING <br /> a9osra <br /> J. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 49 50 <br /> tg 1.CONTINUOUS ELECTRONIC MONITORING ❑2,FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS 099.OTHER(Specify): „---•. bvws % ° 36. <br /> PANEL MANUFACTURER: 8191\Ar .•,T• MODEL R: _m�—_, <br /> 4W57 • MODEL g(S):1_ _71 .. +90-59 <br /> LEAK SENSOR MANUFACTURER' <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS Q a.YES ❑b.NO 49459 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ®C <br /> a YES O b.NO <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® e.YES ❑b.NO 4' 1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT RIB DISPENSER a.YES J O b.NO — <br /> 490 as <br /> 2. <br /> —UDCCONSTRUCTION IS M1.STNGL6WALLED yaj 2.D6118L&WALLED <br /> 49aaN <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACES MONITORED BY: ❑1.LIQUID EJ-2.PRESSURE ❑3 VACUUM 4906re <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 13-WS <br /> b. 0 <br /> "VR,.P@*jUDIC 9YS2MM TMSTING <br /> ❑ 1 ELD TFSFING THIS PACII.I7Y HAS BEEN NOTIFIED BY TIE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 49°69 <br /> _ EI'C N ELD MUST BE PERFORMED. PERIODIC ELD IS PbRNORMED EVERY 3ti MONTHS AS REQUfRED. 23 CCR ZtW4.1 <br /> 499+4 <br /> �2.gECONDARY COIVI'AiNAfENT'COMPONEIPFS ARE TESTED F•VHRY 36 MONTII6. �-.._,. _.... <br /> ®3.SPII.L BUCKETS AAE TP,STED ANNUALLY. 4'pb1 <br /> ' VIILRECURDKEEPING ... <br /> Tile following monitadnglmeintrnance newels ere kept ibr Nis facility: <br /> Alarm logy 4906as Visual Impecrion Records 49e69a ❑Tank Integrity resting rc9ulb aw4u <br /> SIR testing results(and supporting documentation rocords). 49069a ❑ Tank gauging m9ulU(arid supporting documentatlon records). 49or49 <br /> ❑ATG Tasting results(and supporting documentation mcorda).4906ar � Cortosion Protection ad-day logs 4w6es <br /> Fquipment i1181n1eh1811ce and calibration records. 49a6m <br /> UL TRAINING <br /> IPersonnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob dudes. 4 a <br /> FERENCE DOCUMENTS MAINTAINED AT FACILITY(Chock an that apply) <br /> BrTHIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)4W.* <br /> PERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Rcquircd)49os9e <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 49owd <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49 % <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS • MANUAL. AND <br /> STATISTICAL INVENTORY RECONCILIATION,+w✓rir <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"49a692 <br /> ❑ OTHER(Specify):wqt ma <br /> EMS facility has a"Dcsignetcd USTOpens ar"who has passed the Califomia UST Sysum Operator Exam is M istered by the International Code Council(ICC). <br /> The"Desigarted UST Operator"will rain facility employees in the proper operation and mainumance,of the UST systems annually.and within 30 days of hire.This <br /> raining will include,but is not limtcd to,the following: <br /> D Operation of the UST synorw in a manner consistent with the facility's best management practices <br /> D The facility employee's role with regard w the monitoring equipment as specified in this UST Monitoring Plan <br /> D The facility employea's role with milord to spills and overfills as specified in the UST Response Plan <br /> D Names of contact person(s)for amcrgencies and monimring alarms.490-10 <br /> IL:UE)MMEN DMONALVOORMATION <br /> Pmvnde odditmnel comments here or indicate how nary pages with additional information on specific monitoring procodums are attached to this plan.490-71 <br /> linea) ar.rea) r-IoPPe�, 5e-}- A a5% <br /> XI,PERSONNEL RFSPONSIBUHMS <br /> The UST Owner/Opeator is responsiblo for ontiming that:1)the daily/routine UST monitoring actviow error maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records arc maintained properly. <br /> The following person a)are responsible for performing the monitoring end equipment maintenance <br /> NAME 49att TITLE '�� r r90-T <br /> NAME 499.1+ TIYLE H0.ry <br /> The Designated Operator shall perform a mGnthly visual inspection of the facility.provide a report to the owner/opeator,and inform the owner/opernmr of airy <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certif that rhe information mvided herein is true and accurate to the best of my M"Cdgc, <br /> APPLICANT SIGNATURErsa.ls DATE: <br /> of r�v� <br /> ury ow c/ <br /> r9a>a APPLICANT TITLE: r9o19 <br /> APPLICANT NAME(print)! <br /> Ma} v, G ;Qns �to <br /> UPCP USF-D(12/1007)3/4 <br />