Laserfiche WebLink
Feb. 4. 2009 3:45PM No. 1797 P. 2 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> LNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(Page I ora) <br /> TYPE OF ACTION ❑�q 1.NEW PLAN 2,CHANGE OF INFORMATION 49o.t <br /> PLAN TYPE 'f"1.MONTFORING IS IDCAL FOR ALL USTs AT THIS FACILITY. + <br /> Check one item oNy) ❑ 2,THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(91 <br /> 1, FACII:ITY INFORMATION <br /> FACILITY ID If(Agenry Use Only) I I I _ _ s <br /> BUSINESS NAME(Same M FACILITY NAME) r� s.w'I I 'fir r(.r' <br /> BUSINESS SITE ADDRESS 1815 W . L.dW nos. CITY /rbc M 104. <br /> IL EQUIPMENT TESTING AND PREVFNITVE MAINTENANCE <br /> Testing,prevcntivc maintenance,and calibration of monitoring equipment(c.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the cquipmant maeuP4caoers'inswetions,or arm udly,whichever is mom frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR U632,2634 2638 2641 <br /> MONITORING EQUIPMENT IS SERVICED ES 1.ANNUALLY ❑ 99.OTHER(Specify), 4� <br /> -UL-MONITORINGLWATIONS <br /> Ei I.NEW NITE-FM PLAN/MAP SUBMITTED WITH TIDS PLAN. W 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> W TANK-MUNITORTNG IS:PERFORMED'I)SDVG THE FOLLOWING METHOD(S):. <br /> Lx I.CONTI UOUS ELECTRONIC TANK MONITORING OP ANNULAR(DNTERSTFTIAI,)SPACE(S)OR SECONDARY CONTAINMENT <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARMS (23 CCR F2632,Mail) <br /> SECONDARY CONTAINMENT IS; a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURRED ❑d.UNDER VACUUM ° <br /> PANEL MANUF ITra yry "90.1. I MODEL#• _ 4so-s' <br /> LEAK SENSOR MANUFACTURER: 490.9' 1 MODELAS): L-S- "gala <br /> Lj z.AUTOMATIC TANK GAUGING(ATG)SYS67 EM USED TO MONITOR SINGLE WALT.TANKf51 123 CCR 12643) +Asst <br /> PANEL MANUFACTURER: 4 Iz MODEL N: °gall <br /> IN-TANK PROBE MANUFACTURER _ 4W14. MODEL#(S): 4s 13 <br /> LEAK TEST FREQUENCY: ❑ aCONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 4' 1. <br /> - 0 d.MONTISY E_e.OTHMM(Specify):____ <br /> PROGRAMMED TESTS: ❑ a.0.1 gp.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify); mxirs <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§264Q1): nazo <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR 12644 TESTING PERIOD; ❑ a,36 HOURS ❑ It,60 HOURS 49631 <br /> 4s n <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 4s " <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY I] a OTHER(Specify): <br /> ❑99.OTHER (Speciryy 4x.21 <br /> 4 11 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Cheek aD[hat apply) <br /> LCONTEV000S MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND <br /> I. +so-aa <br /> AL ALARMS (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS;IVa DRY ❑b.LIQUIDFILLED [].PRESSURIZED ❑Q UNDER VACUUM °99'39 <br /> PANEL MANUFACTURER. <br /> 4 <br /> 961p MOOING.#: .4 490.11 <br /> LEAK SENSOR MANUFACTURER: MDFL ��S <br /> 4sa�a j MODF.I, L#(S): S_3 4x"13 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN, e.YES ❑b.NO 4s0.s+ <br /> FAIL R RIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. E)a YES ❑b.NO wass <br /> 2,MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.pA LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR 6263Q _ 4surn <br /> MILLI)MANUFACTUREWS): ca K... _Yw.u90Ai MODEL#(S): (LT CCR 12Q G4x39 <br /> ❑ 3.ELECTRONIC LIVE LEAK DETECTOR(ELLD)THAT UTINELY PERFORMS 3.0 g.p.h.LEAK TESTS 49o-29 <br /> ELLD MANUFACTURER(S) a9a4a ! MODEL#(S): 4 1 <br /> PROGRAMMED IN LINE LEAK TEST: ❑ L MIND"MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. Axis ! <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a YES ❑b.NO <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN, ❑a.YES ❑b.NO "90'00 <br /> ❑ 4.PIPE IVTEGRITY TESTUji6- <br /> TEST FREQUENCY ❑ a ANNUALLY C3 b.EVERY 3 YEARS In C.OTHER(Specify) <br /> ax4aax41 <br /> Ll 5.VISUAL PIPE MONITORING. 4gp,y <br /> FREQUENCY ❑ a.DAILY I] b.WEEKLY ❑C.MM.MONTHLY d EACH TAME 3YMm OPERATED• 4x49 <br /> •�brlvombrin dinbmiM .w "n i5H1.. <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA FLI CCR§263641x3)(. Asoso <br /> Lj 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6,7 IS CONNECTED TO THE TANK SYSTEM <br /> +sv-sr <br /> ❑ 99,OT'HER(Specify) 4sus: <br /> __ 4xss <br /> UPCF UST-D(12/2007)1/4 <br />