Laserfiche WebLink
Jan. 21. 2010 6:30AM — No. 3418 P. 4 <br /> ..0e <br /> UNDERGROUND STORAGE TANK <br /> RESPONSE PLAN—PAGE I (One form per facility) <br /> TYPE OF ACTION ❑ I.NEW PLAN 0 2.CHANGE OF INFORMATION Rei. <br /> I. FACILITY INFORMATION <br /> FACILITY M R (Agency Use On& _ <br /> ROSINESS NAME(Same M FACILITY NAME) Rox <br /> r uIA <br /> ItFS <br /> BUSINESS SITE AD s 1iO3 CITY q0d. <br /> iL SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements dun emmrgency response plans and procedures in the th ility's Hazardous Materials <br /> Business Plan. <br /> If safe to do so,facility personnel will take immediate measures to control or stop any relesso(c.g.,activate pump shut-off,etc.)arid,if necessary,safely remove <br /> remaining hazardous material from the UST system <br /> D Any release to secondary containment will be pumped or otherwise removed within a i mr consistent with the ability of the secondary containment system W <br /> contain the ha aMous material,but not greater than 30 calendar days,or smur if required by the local agency. Rcwvcmd hamedous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbont mate reel which has became loo saturated to be <br /> effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in Recordanec with 22 CCR§66262.11 finds that <br /> it is wo-hamrdow. Used absorbent material, musablc or waste,will be stored in a property labeled and sealed wntaimav, Waste material shall be disposed <br /> appropriately. <br /> D Facility persormel will determine whether any wirer removed from secondary,containment systems, or from clean-up activity,has been in contact with any <br /> hazardous minimal,If the water is contaminated,4 will be mm aiscd as hazardous west,unless a waste determination in WcordBwe with 22 CCR¢66262.11 fads <br /> that it is non-hazardous. If this water has a petroleum sheen(i.e,rainbow calors),it is wnmminated A thick Floating petroleum layer may not necessarily display <br /> rainbow colors. Water(hast rdow or rwn-hazardous)fmm sumps,spill containers,em.will tet be disposed to storm water systems. <br /> We will review secondary containment systems for possible deterioration if my of the following conditions occur: <br /> 1. Hazardous material in contact with secondary containment is not compatible,with the material used for secondary containment <br /> 2. Sawndarywrimminent is prone to damage from amy rquipm,at wed to remove m cicm up hazardous material collected in secondary containment <br /> 3. Hazardous material,other than the productfwasro stored in the primary containment system,is placed'inside secondary containment to trust or neutralize <br /> released product/waste,and the added material or resulting material from such a combination is not compatible with secondary containment <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept pmmenently on-stte is listed in the futility's Hecardous Materials Business Plan. This <br /> equipment is inspected at least monthly,and after each use,supplies are replenished as neodod. DOlIctive equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SITE,BUT AVAILABLE FOR USE IF NEEDED: (Complete nly if liwble <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Rte,. Rao ria <br /> RI I. w1 mt. <br /> Rix Rol, Rax <br /> It A rU4. R1A <br /> RIs. RIs. ala. <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)ISIARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME Roo, TITLE Iso. <br /> J j`r d-L. <br /> NAME R41. TITLE RSI. <br /> NAME Roz TITS Rss. <br /> NAME len. TITLE Wz <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br /> ❑Additional System testing or data collootion GFtnipeenon by qualified persons ❑Recalibration of equipment <br /> Other <br /> R&O <br /> UST Response Plan(3/2108)-113 <br />