My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
18806
>
2300 - Underground Storage Tank Program
>
PR0232388
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2022 10:04:29 AM
Creation date
11/5/2018 6:40:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232388
PE
2361
FACILITY_ID
FA0003607
FACILITY_NAME
WOODBRIDGE AM PM*
STREET_NUMBER
18806
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258
APN
01543010
CURRENT_STATUS
01
SITE_LOCATION
18806 N LOWER SACRAMENTO RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\18806\PR0232388\COMPLIANCE INFO 2016.PDF
QuestysFileName
COMPLIANCE INFO 2016
QuestysRecordDate
6/12/2017 11:04:41 PM
QuestysRecordID
3225123
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. Results of Testing/Servicing <br /> Software Version Installed. 329.01 <br /> m late the followin checklist: <br /> ® Yes ❑ No' Is me audible alarm operational? <br /> ® Yes ❑ No• Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ Ne Were all sensors installed at lowest point of secondary containment and positioned so =equipment <br /> operation?Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring sy❑ NIA fails to operate, or is electrically disconnetied? If yes: which sensors instate positive shut-down? (Check all that appl <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as me primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> ® NIA installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ®Yes• ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product, ®Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was nng system set-up reviewed to ensure proper settings?Attach set up reports it applicable <br /> ® Yes ❑ No' Imonito <br /> s all monitoring equipment operational per manufacturers specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: SJV EH ARIS ON SITE ALL PASSED <br /> 2/21/07 <br /> Monitoring System Certification Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.