Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed. 329.01 <br /> m late the followin checklist: <br /> ® Yes ❑ No' Is me audible alarm operational? <br /> ® Yes ❑ No• Is the visual alarm operational? <br /> ® Yes ❑ No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ® Yes ❑ Ne Were all sensors installed at lowest point of secondary containment and positioned so =equipment <br /> operation?Yes ❑ No' If alarms are relayed to a remote monitoring station,is all communications equipment(e.g <br /> ® N/A <br /> ® Yes ❑ No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring sy❑ NIA fails to operate, or is electrically disconnetied? If yes: which sensors instate positive shut-down? (Check all that appl <br /> Sensors; ®Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? ®Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as me primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br /> ® NIA installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly? If so,at what percent of tank capacity <br /> does the alarm trigger? 0% <br /> ❑ Yes ® No Was any monitoring equipment replaced? If yes,identify specific sensors,probes,or other equipment replaced and list the manufacturer name <br /> and model for all replacement parts in Section E,below. <br /> ®Yes• ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br /> ❑Product, ®Water. If yes,describe causes in Section E,below. <br /> ® Yes ❑ No' Was nng system set-up reviewed to ensure proper settings?Attach set up reports it applicable <br /> ® Yes ❑ No' Imonito <br /> s all monitoring equipment operational per manufacturers specifications? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: SJV EH ARIS ON SITE ALL PASSED <br /> 2/21/07 <br /> Monitoring System Certification Page 2 of 4 <br />