Laserfiche WebLink
F. In-Tank Gauging Equipment: ~� �r <br /> 9 9/SIRE q p ® Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> ❑ Yes ❑ No' Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No' Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No' Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No' Were all probes reinstalled properly? <br /> ❑ Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these deficiencies were or will be correctetl. <br /> .ine Leak Detectors(LLD: ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes ❑ No' For equipment start-up or annual equipment certific=system <br /> as a leak simulated to verity LLD performance? (Check all that apply) <br /> ❑ N/A Simulated leaM <br /> 3 g.p.h.; ❑0.1 g.p.h ❑0. <br /> ® Yes ❑ No' Were all LLDsd operational al and accurate witlatory requirements? <br /> ® Yes ❑ No- Was the testinus properly calibrated?Yes ❑ No' For mechanicoes the LLD restrict product fletects a leak?N/A <br /> Yes ❑ No' For electronics the turbine automatically shthe LLD detects a leak?N/AYes ❑ No' For electronic es the turbine automatically shany portion of the monitoring system is disabled or disconnected?N/AYes ❑ No' For electronic s the turbine automatically shny portion of the monitoring system malfunctions or fails a test? <br /> ® N/A <br /> Yes ❑ No' For electronic LLD$,have all accessible wiring connections been visually inspected? <br /> ® N/A <br /> ® Yes ❑ No' Were all items on the equipment manufacturers maintenance checklist completed? <br /> In Section H,below,describe how and when these tleficiencies were or will be correctetl. <br /> H. Comments: Leak Detectors <br /> ALL 3 LDS PASSED <br /> Monitoring System Certification Page 3 of 4 2/21/07 <br />