My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011- 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10878
>
2300 - Underground Storage Tank Program
>
PR0231598
>
COMPLIANCE INFO_2011- 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 7:08:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011- 2015
RECORD_ID
PR0231598
PE
2361
FACILITY_ID
FA0001146
FACILITY_NAME
MORADA CHEVRON FAST N EASY #60*
STREET_NUMBER
10878
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08607002
CURRENT_STATUS
01
SITE_LOCATION
10878 N HWY 99 E
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10878\PR0231598\COMPLIANCE INFO 2011- 2015 .PDF
QuestysFileName
COMPLIANCE INFO 2011- 2015
QuestysRecordDate
5/17/2017 4:55:05 PM
QuestysRecordID
3383937
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
242
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />0 <br />F. In Tank Gauging f SIR Equipment X Check this box if tank gauging is used only for inventory control. <br />❑ Check this box N no tank gauging or SRR equipment is installed. ate— ■� <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. RECEIVED <br />_J L ` C a q <br />CemMars rhCENinwlM chu4rliM• "�lG G Gin.il'i <br />❑Yes <br />❑ <br />No' <br />Has an Input wiring been inspected for proper entry and termination, including testing for ground taulfs? <br />J Yes <br />❑ <br />No` <br />, Were all tank gauging probas visually Inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No' <br />Was accuracy of system product levet readings tested? <br />Yes <br />❑ <br />tie` <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No' <br />Were all probes reinstalled property? t r <br />❑ Yes <br />0 <br />NO, <br />Were ail terns on the equipment manufacturer's maintenance cherkhsi completed? <br />... ...o w...«. , , V awn,w ,.vw a„V wlnil ii�p VpI1GgIIGIC.9 AaB Or "I OR LOreCOBa. <br />G. Line Leak Detectors JLLD): ❑ Check this box if LLDs are not installed <br />complete the <br />Wowing checklist <br />X <br />Yea <br />c <br />No' <br />For equipment start-up or annual equipment cue Wt,,bon, was a leak simulated to verify LLD Performance? (Check ad <br />11 <br />MA <br />that apply) Simulated leak rate: X 3 g.p.h.; 0 0.1 g.p.h ; ❑ 02 g.p.h. <br />x <br />Yes <br />c <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />X <br />Yes <br />C <br />No- <br />Was the testing apparatus properly calibrated? <br />X <br />Yes <br />7 <br />No' <br />For mechanical LLDa, does the LLD restrid product flaw if it detects a leak? <br />❑ <br />NIA <br />❑ <br />Yes <br />C <br />No' <br />For electronic LLDs, does the turbine automatically shut off If the LLD detects a leak? <br />X <br />WA <br />Yes <br />❑ <br />No' <br />For electronic LLD , does the turbine automatically shut off 'if any cotton of the monitoring systam is disabletl or <br />X <br />N!A <br />disconnected? <br />Yes <br />0 <br />No' <br />Foreieatrooio LLDs, does the turbine auWft9dCally Shut of if arty pOnion of the monitoring system malfunctions fails <br />X <br />NIA <br />or <br />a test? <br />7 <br />Yes <br />] <br />No" <br />For ektdrontc LLDs, have all accessible wiring connections been visually inspected? <br />x <br />wa <br />X Yes <br />❑ No' <br />Were all items an the equipment manufacturers marlenance checklist corrpleted? <br />H. Comments: <br />Vordtodrp System Certification Page 3 of 4 12107 <br />3 <br />2015 <br />(ENTAL <br />]TAACkIT <br />g d dt77 1091 LZAeW <br />
The URL can be used to link to this page
Your browser does not support the video tag.