Laserfiche WebLink
D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Complete the following checldist: <br /> es ❑ No* is the audible alarm operational? 1 <br /> Yes ❑ No* Is the visual alarm operational? <br /> es Q No* Were all sensors visually inspected functionally tested,and confumed operational? <br /> 1k es ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper ration? <br /> Yes ❑ No' If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> Q N/A operational? <br /> -Yes Q No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A Monitoring system detects a leak,fails to opepte,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply)<CI==i=&Cispenser Containment Sensors. - <br /> Did you confirm positive shutdown due to leakonnection? ❑Yes; ❑No. <br /> ""Yes O No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> ❑ N/A mechanical overfill prevention valve is installed),is the overfill warning alarm visible and audibl. the tank <br /> fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> ❑ Yes* No Was any monitoring equipment replaced? if yes,identify specific sensors,probes,or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section I3,below. <br /> l�Yes* ❑ No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)Q <br /> Product; Q W airs. >f s,describe causes is Section E,below. <br /> ❑ Nc* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> Yes O No* Is all monitoring ui mentoperational per manufacturer's s ificadons? <br /> •In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments- <br /> Page 2 of 3 83101 <br />