My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment; D Check this box if tank gauging is used only for inventory control. <br /> D Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Co lete the followin checklist: ' <br /> Q Yes ❑ Ne Has all input wiring been inspected for proper and termination,including testing for ground faults? <br /> D Yes LINo* I Were all tank ganging probes vcsuel for damage and residue buildup? <br /> WQ s accuracy of system pro level readings tested? <br /> asaccuracyof water level readings tested? <br /> ere all sreinstalled properly? <br /> all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Sect' a ,below,describe how and when these deficiencies were or win be corrected. <br /> G. Line Leak Detectors (LLD)-. Q Check this box if LLDs are not installed. <br /> Com tete the follow in checklist <br /> es Q No* For equipment start-up or antral equipment certification, was a leak simulated to verify LLD performance? <br /> Q N/A (Check all Alar apply) Simulated leak rate: W g.p.h; D 0.1 g.p.h; Q 0.2 g.p.h. <br /> es Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> es 0 No* Was the testing apparatus properly calibrated? <br /> ❑ Yas No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O 11A <br /> Q Yes Q No. For electronic LLD&,does the turbine ataomatically shut off if the I F D defects a leak? <br /> O N/A <br /> D Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> a NIA or disconnected? <br /> Q Yes ❑ No* For aleetrouie 1LDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> Q N/A or fails a test? <br /> ❑ Yes ❑ No* For electromc LLDs,have all accessible wiling Connections bean visually inspected? <br /> D N/A <br /> zf Ycs Q No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section A,below,describe how and when these deficiencies were or will be correct,& <br /> H. Comments: <br /> V <br /> Page 3 of 3 03101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.