Laserfiche WebLink
SWRCB,January 2002 Page 2 of 8 <br /> 4. TANK ANNULAR TESTING <br /> Test Method Developed By: U Tank Manufacturer LXlndustry Standard U Professional Engineer <br /> U Other(Spec) <br /> Test Method Used: U Pressure LXVacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: Vacuum enerator/ a es Equipment Resolution: <br /> Tank# 1 Tank# Tank# Tank# <br /> Is Tank Exempt From Testing?' U Yes ONO U Yes U No U Yes U No U Yes U No <br /> Tank Capacity: 9000/3000 <br /> Tank Material: Glass <br /> Tank Manufacturer: Modern Weldihg <br /> Product Stored: Re D' <br /> esel <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: hr. <br /> Test Start Time: 9:30 <br /> Initial Reading(R,): 7" HG <br /> Test End Time: 10:30 <br /> Final Reading(R,): 7• HG <br /> Test Duration: 1 hr. <br /> Change in Reading(R,.-R,): 0 <br /> Pass/Fail Threshold or Criteria: 0 LOSS <br /> Test Result: LXPass U Fail U Pass U Fail U Pass U Fall U Pass U Fall <br /> Was sensor removed for testing? N Yes IJ No U NA U Yes U No U NA U Yes U No U NA U Yes U No U NA <br /> Was sensor properly replaced and X Yes U No U NA <br /> verified functional after testing? U Yes U No U NA U Yes U No U NA U Yes U No U NA <br /> Comments—(include information on repairs made pd6r to testing,and recommended follow-upforfailed tests) <br /> ' Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. (California Code of Regulations,Title 23,Section 2637(a)(6)) <br />