My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page 3 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: U Piping Manufacturer Qt Industry Standard U Professional Engineer <br /> U Other(Specify) <br /> Test Method Used: XI Pressure U Vacuum U Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: p, sure cracres Equipment Resolution: <br /> Piping Run# 1 Piping Run # Z Piping Run# Piping Run# <br /> Piping Material: fiber lass Fiberglass <br /> Piping Manufacturer: meron Ameron <br /> Piping Diameter: n n <br /> Length of Piping Run: 150 , 50 ' <br /> Product Stored: <br /> Method and location of From pipe sum to <br /> piping-run isolation: under (jjqp pin SAME <br /> Wait time between applying <br /> pressure/vacuum/waterand i hr. N/A <br /> starting test: 2 <br /> Test Start Time: 9:45 9:00 <br /> Initial Reading(R,): 4.5 PSI 4. 5 PSI <br /> Test End Time: 10: 4 5 9. 0 5 <br /> Final Reading(Rh): . 5 0 <br /> Test Duration: 1 hr. 5 minutes <br /> Change in Reading(R,-R,): 4 PSI 4 . 5 PSI <br /> Pass/Fail Threshold or 4 PSI in 1 hr . 4 PSI in 5 min. <br /> Criteria: <br /> Teat Result: U Pass LXFatl U Pass 11 Fall U Pass U Fall U Pass U Fall <br /> Comments— (include information on repairs made priorm teking,and recommendedfollow-up orfailed tests) <br /> Probable leaks in flex hoses under Bravo Box dispenser pan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.