Laserfiche WebLink
• RCB,January 2002 • Page 4 2 of <br /> 7. UNDER-DISPENSER CONTAINMENT(UDQ TESTING <br /> Test Method Developed By: D UDC Manufacturer dustry Standard d Professional Engineer <br /> D Other(Specify) <br /> Test Method Used: D Pressure d Vacuum ,"ydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: <br /> -LACAn —$ S Equipment Resolution: , u <br /> UDC# UDC# ) 2 UDC # I I-L UDC # <br /> UDC Manufacturer: (?r vo <br /> UDC Material: -ee <br /> UDC Depth: <br /> Height from UDC Bottom to Top <br /> of Highest Piping Penetration: N d () <br /> Height from UDC Bottom to <br /> Lowest Electrical Penetration: 0 <br /> 0 D tA <br /> Condition of UDC prior to <br /> testing: j <br /> Portion of UDC Tested <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes d'No D NA ❑No ❑NA Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> product and water ? <br /> Turbine shutdown response time <br /> Is system programmed for fail- D Yes d No DNA Yes d No DNA �t1 Yes D No D NA D Yes d No D NA <br /> safe shutdown?� <br /> Was fail-safe verified to be <br /> operational?* D Yes D No D NA IXYes D No DNA %Yes D No D NA D Yes d No D NA <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test 1 <br /> Test Start Time: is 7S 7571 10 <br /> Initial Reading (R,): <br /> Test End Time: <br /> Final Reading(RF): t 4 <br /> Test Duration: <br /> Change in Reading(RF-Ri): - uo i —cry o�t <br /> Pass/Fail Threshold or Criteria: coZ ^t oZ <br /> Test Result: D Pass d Fail D Pass Vail ass YO Fail D Pass D Fail <br /> Was sensor removed for testing? D Yes d No A d Yes d No 7WA Yes D No A D Yes d No D NA <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes ❑No ❑NA Yes ❑No ❑NA es ❑No ❑NA ❑Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-u or ailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to Any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />