My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1997-2007
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3550
>
2300 - Underground Storage Tank Program
>
PR0505827
>
COMPLIANCE INFO_1997-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:05:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1997-2007
RECORD_ID
PR0505827
PE
2361
FACILITY_ID
FA0007030
FACILITY_NAME
VALLEY PACIFIC HWY 99 CARDLOCK
STREET_NUMBER
3550
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17916043
CURRENT_STATUS
01
SITE_LOCATION
3550 S HWY 99
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\3550\PR0505827\COMPLIANCE INFO 1997-2007.PDF
QuestysFileName
COMPLIANCE INFO 1997-2007
QuestysRecordDate
6/21/2017 4:01:59 PM
QuestysRecordID
3452124
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
jWRCB,January 2002 • <br /> Page �J of3 <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not E ui ed With SpilUOverfilI Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer <br /> �4ndustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure <br /> ❑Vacuum 19'Aydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: COV) (I)—Sl ) <br /> Equipment Resolution: <br /> Spill Box#4' Spill Box# Spill Box# <br /> Bucket Diameter: p Spill Box# <br /> Bucket Depth: (/ <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> startin test: <br /> Test Start Time: 10 <br /> Initial Reading(R,): <br /> Test End Time: g'.yti 5 <br /> Final Reading(RF): <br /> Test Duration: I S t S <br /> Change in Reading(RF-R,): D <br /> Pass/Fail Threshold or <br /> Criteria: —'00Z <br /> Ua1 <br /> Test Result: @ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include in ormation on re airs made prior to testing, and recommended.follow-up for ailed tests) <br /> Rv Q(P fI A it ie <br /> �tT� <br />
The URL can be used to link to this page
Your browser does not support the video tag.