Laserfiche WebLink
r <br /> i MONITORING AND RESPONSE PLAN - SC <br /> ARCO PRODUCTS COMPANY FACILITY WITH <br /> DISPENSER SPILL CONTAINMENT DEVICES <br /> ARCO Facility: Arcp� c Address: <br /> S tU(a.'�cir� r . <br /> This is a monitoring and response plan of action for facilities with spill <br /> containment devices installed beneath the dispensers. <br /> 1 . CONTAINMENT EQUIPMENT <br /> Dispenser spill containment devices [box(es)) are located beneath <br /> each dispenser to contain any leaks from components and fittings <br /> inside the dispenser cabinet. A mechanical sensor is located in the <br /> box. When the sensor detects the presence of a liquid, it will activate <br /> the impact valve and shut the dispenser down. <br /> 2. MAINTENANCE SCHEDULE <br /> The containment devices will be inspected according to the <br /> manufacturer's instructions by an outside contractor once during each <br /> calendar year. <br /> 3. ROUTINE MONITORING PROCEDURE <br /> On a weekly basis the facility operator shall: <br /> A. Inspect each containment box for the presence of a liquid. <br /> B. Remove debris from the containment box. <br /> If any liquid is found, manually close the impact valve, place the <br /> dispenser "out of service", and call ARCO Maintenance immediately. <br /> 4. RESPONSE PROCEDURE - CONTAINMENT BOXES r <br /> OPERATOR RESPONSIBILITIES <br /> In the event the impact valve is activated and shuts down a <br /> dispenser, station personnel immediately: <br />