My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4855
>
2300 - Underground Storage Tank Program
>
PR0506650
>
COMPLIANCE INFO_1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:15:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0506650
PE
2361
FACILITY_ID
FA0007571
FACILITY_NAME
ARCH ARCO AM PM*
STREET_NUMBER
4855
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
APN
17926051
CURRENT_STATUS
01
SITE_LOCATION
4855 S HWY 99
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4855\PR0506650\COMPLIANCE INFO 1998-2003.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Contact ARCO Maintenance or its designated agent by using <br /> the telephone number previously provided_ <br /> B. Tag the dispenser "out of order" until the liquid has been <br /> removed by authorized persons. <br /> ARCO RESPONSIBILITIES <br /> Method of removing an unauthorized release from the spill <br /> containment device: <br /> A. Any unauthorized release into the containment box will be <br /> removed by ARCO in accordance with California Health and <br /> Safety Code requirements. In the event of an emergency, a <br /> pumping contractor or truck will be available immediately. In <br /> all other cases, equipment availability will be within 12 hours. <br /> B. ARCO Maintenance will be responsible for authorizing and <br /> selecting contractors for the work to be performed. <br /> 5. TRAINING <br /> All employees must be trained in the subject mentioned in Sections 3 <br /> and 4 above. Training needed for the operation of the dispenser <br /> containment devices shall include how to inspect the equipment and <br /> to manually close -he dispenser impact valve. <br /> cAsrosc.00c 6n <br />
The URL can be used to link to this page
Your browser does not support the video tag.