Laserfiche WebLink
D.Results of Testing/Servicing <br /> Software Version Installed: 331.01 <br /> Complete the following checklist: <br /> f: Yes r No* Is the audible alarm operational? <br /> (•: Yes f No* Is the visual alarm operational? <br /> r Yes IF No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> (: Yes r No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere wit <br /> their pro er operation? <br /> fr Yes r No* If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> r N/A <br /> G Yes r No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> r N/A system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> all that apply)r Sump/Trench Sensors; r-.Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor fallure/disconnection?re Yes; r No <br /> r Yes r No* For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve Is Installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> t' N/A so at what Percent of tank capacity does the alarm trigger?% <br /> r Yes* t+ No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> r Yes* r No Was liquid found inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product• =any <br /> yes,describe causes in Section E below. <br /> (r Yes r No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,If applicable <br /> (r Yes Ir No* lls all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> removed 1/2 gallon of liquid from 87 STP sump <br /> Monitoring System Certification Page 2 of 3 12/07 <br />