Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: r Check this box If tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is Installed. <br /> This section must be completed If in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> r Yes r No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> r Yes r No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> r Yes r No* Was accuracy of system product level readings tested? <br /> f Yes IF No* Was accuracy of system water level readings tested? <br /> r Yes r No* Were all probes reinstalled properly? <br /> C Yes r No* Were all Items on the equipment manufacturer?s maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> f•Yes r No* For equipment start-up or annual equipment certification was a leak simulated to verity LLD performance?(Check all that <br /> (• N/A apply)Simulated leak rate:P 3 g.p.h.; r o.l g.p.h; 1...:.0.2 g.p.h. <br /> f: Yes f No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> IT Yes r No* Was the testing apparatus properly calibrated? <br /> r Yes r No* For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> re N/A <br /> IT Yes r No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> r N/A <br /> IT Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> r N/A <br /> (- Yes r No* For electronic LLDs,does the turbine automatically shut off If any portion of the monitoring system malfunctions or fails a test? <br /> r N/A <br /> r No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> r N/A <br /> r Yes r No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> replaced siphon let on 91 STP <br /> Page 3 of 3 12/07 <br />