Laserfiche WebLink
Oitoring System Certification • <br /> Site Address 4943 S.KINGSLEY(FRONTAGE RD) Date of Testing/Service: 06/07/2011 <br /> HWY 99 @ ARCH AIRPORT RD <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 329.02 <br /> Complete the following checklist: <br /> X Yes No' Is the audible alarm operational? <br /> ❑X Yes El No' Is the visual alarm operational? <br /> ❑X Yes No' Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> ❑X Yes ❑No' Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not <br /> interfere with their proper operation? <br /> X Yes No' N/A If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> nX Yes ❑No' Q N/A monitoring system detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive <br /> shut-down?(check all that apply) ❑X Sump/Trench Sensors; ❑X Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks acid sensor failure/disconnection? Z Yes ❑No <br /> �X YesNo' N/A For tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.:no mechanical <br /> overfill prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill points(s)and operating <br /> property? If so,at what percent of tank capacity does the alarm trigger? 90 i <br /> ❑ Yes' XM No Was any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E,below. <br /> Q Yes' ❑No Was liquid found inside any secondary containment systems designed as dry systems?(check all that apply) ❑Product; <br /> 0 Water. If yes,describe causes in Section E,below. <br /> �X Yes No. Was monitoring system set-up reviewed to ensure proper settings?Attach set-up reports,if applicable. <br /> �X Yes No' Is all monitoring equipment operational per manufacturers'specifications? <br /> *In Section E below,describe how and when these deficiences were or will be corrected. <br /> E. Comments: <br /> removed a cup of water from the 87,89,91 stp sumps <br /> Page 2 of 3 Based on CA farm dated 03/08 <br />