0 0 <br /> -4- <br /> Vapor Flow Meter Operability Test <br /> 1. Connect a notebook PC — See figure 5-9 of the ISD Install, Setup & Operation <br /> Manual. Run Veeder-Root's "ISD PC Setup Tool", v1.03 or higher, to the <br /> dedicated TLS serial port that is required for ISD reports access. Using the tool, <br /> access the individual fueling point"dispensing event ISD A/C results as needed <br /> in this test procedure. These results are compared to the manually measured <br /> V/L's in the procedure. Training on use of the tool is provided as part of the <br /> Veeder-Root training program for ISD. A trained service technician must be <br /> present when performing this operation. <br /> 2. Select a dispenser and note the fueling point numbers on the data form. Obtain <br /> the vapor flow meter serial number (available from the EVR/ISD Setup Printout— <br /> see Figure 3-6 in the ISD Install, Setup & Operation Manual). Record the serial <br /> number on the data form. <br /> 3. Conduct a Healy EVR Phase I I system V/L test per Exhibit 5 of VR-202-D with <br /> lowest grade fuel available on that dispenser to obtain a V/L result. <br /> 4. Obtain the corresponding ISD A/L value for that V/L test obtained from the TLS <br /> using the "ISD PC Setup Tool". <br /> 5. Compare the ISD A/L value for that dispenser hose to the V/L result (subtract V/L <br /> result from A/L value and note difference on the form). <br /> Pass: If the difference is between -0.15 and +0.15, then the ISD A/L value <br /> is within +/- 0.15 of the V/L result. Circle "Pass" to document that <br /> the ISD flow meter in that dispenser passes and repeat the <br /> procedure beginning at Step 2 for the next dispenser. <br /> Continue: If the ISD A/L value is NOT within +/- 0.15 of the V/L result, then go <br /> to Step 6. <br /> 6. Run two more V/L tests per Exhibit 5 with lowest grade fuel on the same hose <br /> and average the two results with the first V/L result from Step 3. <br /> 7. Obtain the corresponding two ISD A/L values from the TLS and average the two <br /> values with the first ISD A/L value from Step 4. <br /> 8. Compare the average of the 3 ISD values for that hose to the average of the 3 <br /> V/L results (subtract V/L average from A/L average and note difference on the <br /> form). <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 9—VR-202-D <br />