Laserfiche WebLink
-5- <br /> Pass: If the ISD A/L average is within +/- 0.15 of the average of the 3 V/L <br /> results, the ISD flow meter in that dispenser passes the operability <br /> test. Go to the next dispenser and repeat the procedure beginning <br /> at Step 2. <br /> Continue: If the ISD A/L average is NOT within +/- 0.15 of the average of the <br /> 3 V/L test results, then go to Step 9. <br /> 9. If a second fueling position is available on the dispenser, repeat the tests <br /> beginning at Step 3 for the second fueling position. If the second fueling position <br /> tests do not pass Steps 3 through 8, then the flow meter is not in compliance <br /> with the requirements of Exhibit 2. <br /> Site Shutdown Test <br /> This test must be performed by a certified Veeder-Root contractor. <br /> 1. Remove power from TLS console. <br /> 2. Confirm power to submersible pumps is off by verifying that gasoline dispensing <br /> has been disabled. <br /> 3. Restore power to TLS console. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 9—VR-202-D <br />