My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
4943
>
2300 - Underground Storage Tank Program
>
PR0506488
>
COMPLIANCE INFO_2008-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
11/5/2018 8:17:55 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2009
RECORD_ID
PR0506488
PE
2361
FACILITY_ID
FA0007458
FACILITY_NAME
7-ELEVEN INC #32190
STREET_NUMBER
4943
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95215
CURRENT_STATUS
01
SITE_LOCATION
4943 S HWY 99
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\4943\PR0506488\COMPLIANCE INFO 2008-2009.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
300
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-5- <br /> Pass: If the ISD A/L average is within +/- 0.15 of the average of the 3 V/L <br /> results, the ISD flow meter in that dispenser passes the operability <br /> test. Go to the next dispenser and repeat the procedure beginning <br /> at Step 2. <br /> Continue: If the ISD A/L average is NOT within +/- 0.15 of the average of the <br /> 3 V/L test results, then go to Step 9. <br /> 9. If a second fueling position is available on the dispenser, repeat the tests <br /> beginning at Step 3 for the second fueling position. If the second fueling position <br /> tests do not pass Steps 3 through 8, then the flow meter is not in compliance <br /> with the requirements of Exhibit 2. <br /> Site Shutdown Test <br /> This test must be performed by a certified Veeder-Root contractor. <br /> 1. Remove power from TLS console. <br /> 2. Confirm power to submersible pumps is off by verifying that gasoline dispensing <br /> has been disabled. <br /> 3. Restore power to TLS console. <br /> Healy Phase 11 EVR System Including Veeder-Root ISD, Exhibit 9—VR-202-D <br />
The URL can be used to link to this page
Your browser does not support the video tag.