Laserfiche WebLink
•Monitoring System Certification <br />Site Address: 4943 S. KINGSLEY <br />MKT 2237 <br />F. In -Tank Gauging / SIR Equipment <br />Date of Testing/Service: 01/17/2007 <br />Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />G. Line Leak Detectors (LLD) : <br />Complete the following checklist: <br />❑ Check this box if LLD$ are not installed. <br />Q Yes <br />E] No' <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: x❑ 3 g.p.h ❑ 0.1 g.p.h ❑0.2 g.p.h <br />X Yes <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />XON, <br />Was accuracy of system product level readings tested? <br />❑No • <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑No • <br />Were all probes reinstalled propedy? <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Q Yes <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />* In the Section <br />H. <br />belowdeccrihP hr,w PM .m- e:.e..,. <br />G. Line Leak Detectors (LLD) : <br />Complete the following checklist: <br />❑ Check this box if LLD$ are not installed. <br />Q Yes <br />E] No' <br />❑ WA <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: x❑ 3 g.p.h ❑ 0.1 g.p.h ❑0.2 g.p.h <br />X Yes <br />❑ No • <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />x Yes <br />❑No • <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑No • <br />0 NIA <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Q Yes <br />❑No • <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />0 Yes <br />[]No • <br />❑ NIA <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />QYes <br />❑No • <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />Yes <br />[]No• <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />l❑x <br />U Yes <br />* In the Section <br />❑No • <br />H. <br />below. <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />descdhw h. and whe,, rhe.. <br />H. Comments: <br />Page 3 of 3 Based on CA form dated 03/01 <br />