Laserfiche WebLink
F.In-Tank Gauging/SIR Equipment: <br /> r Check this box if tank gauging is used only for inventory control. <br /> r Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> "Er� <br /> all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> e all tank gauging probes visually inspected for damage and residue buildup?accuracy of system product level readings tested?accuracy of system water level readings tested?e all probes reinstalled properly?No* all items on the equipment manufacturer's maintenance checklist completed? ; <br /> *In the Section H,below,describe how and when these deficiencies were or wild be corrected. <br /> G.Line Leak Detectors(LLD): r Check this box if LLDs are not installed. <br /> ENVIRONMENTAL HEALTH <br /> Complete the following checklist: DEPARTMENT <br /> • Yes No* For equipment start-up or annual equipment certification was a leak simulated to verify LLD performance?(Check all that <br /> N/A apply)Simulated leak rate:W 3 g.p.h.; r o.P g.p.h; t;;0.2 g.p.h. <br /> • Yes No* ere all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes NO as the testing apparatus properly calibrated? <br /> Yes No* For mechanical LLDs,does the LLD restrict product Flow if it detects a leak? <br /> + N/A <br /> • Yes No* For eiedronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> N/A <br /> • Yes No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system is disabled or disconnected? <br /> • Yes r No* For electronic LLDs that are programmed for positive shut down,does the turbine automatically shut off if any portion of the <br /> N/A monitoring system malfunctions or fails a test? <br /> • Yes r No* For electronic LLDs,have all accessible wiring connections been visually inspected'? <br /> N/A <br /> • Yes r No* ere all items on the equipment manufacturer's maintenance checklist completed? <br /> *to the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 12/07 <br />