Laserfiche WebLink
I <br /> General Notes <br /> SAWED GROVE, WIDTH 3/16" MIN. - <br /> AND 5/16" MAX. JOINT TO BE <br /> FILLED TO APPROXIMATELY 1/4" <br /> OR SURFACE OF PAVEMENT 1: THE GENERAL CONTRACTOR SHALL VERIFY EXISTING SITE CONDITIONS PRIOR TO BID SUBMISSION. <br /> D'/4, 4' MAX. 2. ALL.DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. <br /> ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE <br /> PROCEEDING WITH THE WORK. <br /> INSTALLATION AND TESTING OF PIPING AND SHALL BE PERFORMED BY A LICENSED TANK SERVICE PROVIDER AS REQUIRED <br /> d <br /> BY THE STATE AND LOCAL REQUIREMENTS. . CONTRACTOR SHALL PROVIDE NOTIFICATION TO THE JURISDICTIONAL <br /> AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING TO THE PERMIT REQUIREMENTS. <br /> SEE NOTE #6 (TYP•) 4. ALL ELECTRICAL WORK PERFORMED WITHIN CUSS I HAZARDOUS AREAS. SHALL BE. SEALED PER NEC AND UFC <br /> REQUIREMENTS. � C 0) 0 0 <br /> 4_1/2" TO 6" >. <br /> sp q, EXISTING SLAB GREASE COATED STEEL DOWEL NEW SLAB 5. THE PRODUCT PIPING LAYOUT SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN NATURE AND ARE NOT 0 <br /> W/ 8 X 6 - W1.4 X 1.4 WWF 4 BARS x 18" (SMOOTH) ON W/ 6 X 6 W1.4 X 1.4 WWF INTENDED TO BE AN EXACT REPRESENTATION OF THE PIPING LAYOUT. ..GENERAL CONTRACTOR TO RELOCATE, a •C 0 <br /> •) 6" CENTERS. GROUTED INTO PLACE. MODIFY AND ADJUST PIPING INSTALLATION TO PROVIDE A SYSTEM CONSISTENT WITH THE INTENT OF THE DESIGN. Rf E A Q <br /> •q• GENERAL CONTRACTOR SHALL PREPARE AS BUILT PLANS UPON THE COMPLETION OF THE INSTALLATION. �Q. 0V �(D A� <br /> 16 6. ALL UNDERGROUND PIPING SHALL BE FIBERGLASS UNLESS NOTED OTHERWISE AND SHALL BE INSTALLED PER <br /> 15 MANUFACTURERS SPECIFICATIONS - /}�. <br /> 7. THE GENERAL CONTRACTOR SHALL INSTALL ALL EQUIPMENT REQUIRED FOR COMPLETE INSTALLATION WHETHER OR y„, •� •C O <br /> Slab Construction Joint Detail <br /> 5 GALLON SPILL � NOT THE EQUIPMENT IS PROVIDED BY OWNER OR OTHERS. <br /> CONTAINER WITH 8. ALL DIMENSIONS AND CONDITIONS MUST BE CHECKED AND VERIFIED IN THE FIELD BEFORE STARTING ANY WORK. : L <br /> IN LINE DRAIN ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNER'S ENGINEER FOR HIS DECISION BEFORE W <br /> - 4" BLACK STEEL PROCEEDING WITH THE WORK. REPORT TO OWNER'S ENGINEER IF UNUSUAL SUBSURFACE CONDITIONS ARE FOUND. <br /> RISER (EXISTING) THE OWNER'S ENGINEER WILL DETERMINE IF A SOILS REPORT AND OR. CONTINUING ON SITE INSPECTIONS ARE REQUIRED. d' <br /> 9. REMOVAL OF PIPING SHALL BE PERFORMED BY A LICENSED TANK SERVICE PROVIDER AS REQUIRED <br /> BY THE STATE AND LOCAL REQUIREMENTS. CONTRACTOR SHALL PROVIDE NOTIFICATION TO THE JURISDICTIONAL v/ O 0 <br /> Compliance Notes <br /> AGENCY RESPONSIBLE FOR INSPECTIONS ACCORDING TO THE PERMIT REQUIREMENTS C V <br /> 10. ALL EXCAVATED MATERIAL SHALL BE TESTED FOR CONTAMINATION PRIOR TO REMOVAL FROM THE SITE: <br /> - THE GENERAL CONTRACTOR' SHALL SEGREGATE STOCKPILES ON. SITE IF REQUIRED. THE CONTRACTOR SHALL ' •0) <br /> GENERAL CONTRACTOR SHALL PROVIDE 72 HOUR NOTIFICATION TO GOVERNING AGENCY DISPOSE OF CONTAMINATED AND UNCONTAMINATED EXCAVATED MATERIALS AWAY FROM THE SITE AT APPROVED AREAS <br /> ARRANGED AND PAID FOR BY THE CONTRACTOR. ALL UNCONTAMINATED BACKFILL MATERIAL REMOVED DURING <br /> PRIOR TO PIPING TESTING OR INSPECTION. EXCAVATION MAY BE REUSED AS BACKFILL DURING THE REINSTALLATION OF THE TANK SLAB SYSTEM. . Q O <br /> - TANK SYSTEM TO BE INSPECTED BY OWNER'S ENGINEER & GOVERNING AGENCY AT THREE (3) O <br /> r <br /> SEPARATE CONSTRUCTION PHASES AS REQUIRED: 11. GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH ALL FEDERAL, STATE AND LOCAL <br /> 1, PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. LAWS AND REGULATIONS. _ ■ <br /> 2. INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. <br /> 3. FINAL INSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM., Cl <br /> TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING <br /> AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. ® 0 <br /> GENERAL CONTRACTOR SHALL CONDUCT THEIR WORK IN ACCORDANCE WITH THE DEPARTMENT m <br /> OF INDUSTRIAL SAFETY (STATE OF ) FOR EXCAVATIONS OF TRENCHES Installation Notes <br /> 5'-0" OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND. LL (CCd <br /> I ALL.MATERIALS SHALL NI COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS NOTE: THIS TANK LAYOUT IS PROVIDED FOR INFORMATIONAL PURPOSES AND REPRESENTS A SIGNIFICANT Q _ L U <br /> PER NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. NUMBER OF CURRENT TANK CONFIGURATIONS. SITE SPECIFIC CONDITIONS INCLUDING THE NUMBER OF TANKS, <br /> TANK SIZE AND BURY DEPTH MAY VARY, HOWEVER IT IS THE INTENT. OF THE OWNER FOR THE GENERAL , . <br /> CONTRACTOR TO,PERFORM ALL WORK REQUIRED TO DELIVER A COMPLETE AND OPERABLE REVISED TANK SUMP <br /> AND PRODUCT PIPING DELIVERY SYSTEM. tN C <br /> A TWO-POINT FILL RISERS Drive Slab Concrete Specrfications o TURBINE SUMP RETROFIT - CONTRACTOR TO INSTALL NEW WATERTIGHT SUMP TO PROVIDE SECONDARY CONTAINMENT OF W Ly- <br /> TURBINE. / \ <br /> SCALE: NONE 1. UNLESS OTHERWISE NOTED ON THESE DRAWINGS: O2 CONTRACTOR TO INSTALL NEW 'VEEDER ROOT' WIRELESS PRESSURE LINE LEAK DETECTION ((WPLLD)) AT TURBINE. INSTALL <br /> o. CONCRETE REGULAR WEIGHT HARD ROCK CONCRETE (150 LBS/CU FT) PER MANUFACTURER'S INSTRUCTIONS, SEE DRAWING ON TK4-1. INSTALL NEW TLS-350 TUI MONfTOR AT BUILDING WITH C <br /> b. CEMENT - TYPE II, SULFATE RESISTANT WPLLD CONTROLLER NAODULE AND WPLLD AC INTERFACE MODULE (KR). IF. EXISTING TURBINE IS MANUFACTURED BY <br /> c. AGGREGATES - ASTM C33, (MAXIMUM SIZE 3/4 INCHES) "TOKHEIM", INSTALL NEW TURBINE PROVIDED BY ARCO: - _ CdCd <br /> d. 28 DAY CONCRETE STRENGTH DESS 3 CONTRACTOR TO INSTALL NEW TURBINE SUMPS AT TURBINE SIDE TANK MANWAYS TO PREVENT MIGRATION OF BACKFILL '/1 <br /> 3,000 PSI - SLAB (DESIGN BASED ON 2,000 PSI NO SPECIAL INSPECTION REQUIRED) O MATERIAL INTO THE TIURBINE/FILL TANK MANWAY LOCATIONS. a- <br /> e. SLUMP - 3"± 1' - 4" MAXIMUM AT POINT OF PLACEMENT <br /> f. SHRINKAGE 0.05% MAXIMUM ® CONTRACTOR TO INSTALL ISOLATION JACKETS ON ALL EXPOSED METAL PIPING OR FLEXIBLE CONNECTORS TO PRODUCT, <br /> VENT AND VAPOR PIPING. INSTALL ISOLATION JACKET ON TURBINE AND FILL SIDE RISERS. <br /> 0 2 CONCRETE <br /> SLAB THICKNESS $HALLON BE A MINIMUM DRAWINGS OF 6.0 INCHES O CONTRACTOR TO BACKFILL EXCAVATION WITH PEAGRAVEL IN 12' LIFTS. REUSE OLD BACKFILL IF CLEAN, TAKE CARE 0 <br /> TO PREVENT PEAGRAVEL FROM ENTERING SUMP SPACES.. REMOVE ANY TEMPORAY BARRIERS. ' ` <br /> 3. CONCRETE SHALL BE NORMAL WEIGHT WITH A MIX OF 1 : 2 1/2 : 3 1/2, WITH A MAXIMUMCd : V W <br /> 7 1/2 GALLONS EL WATER PER SACK. © CONTRACTOR TO INSTALL NEW CONCRETE TANK SLAB AND REINFORCING, CONTRACTOR TO PROVIDE REBAR CAGES, <br /> L 4. REINFORCING STEEL FOR DRIVE SLABS SHAT BE 6 k 6 - 1.4/1.4 WWM WELDED WIRE FABRIC SEE SHEET TK3-5. INSTALL NEW TURBINE AND FILL SIDE MANHOLES, CONTRACTOR TO DOWEL INTO EXISTING d/'� Z <br /> OR #3 BARS 0 16 O.C. EACH WAY. SUMP CAGES SHALL BE #3 REBAR TOP AND BOTTOM, CONCRETE TANK SLAB (WHERE APPLICABLE) W/ O4 x 18' STEEL BARS AT 16' O.C. SEE DETAIL #1 AND CONCRETE y.{. <br /> 5. MAINTAIN CONCRETE IN A MOIST CONDITION FOR AT LEAST 7 DAYS AFTER PLACEMENT. SPECIFICATIONS ON THIS SHEET. c Q - <br /> _ C 6. PLACE CONCRETE DIRECTLY FROM TRUCK INTO FORMS, DO NOT PUMP CONCRETE UNLESS O7 CONTRACTOR TO PATCH AND REPAIR ALL ASPHALT AFFECTED BY THE NEW TANK AND PIPING INSTALLATION AND ALL <br /> o SPECIAL INSPECTION, IN ACCORDANCE WITH CHAPTER 3 OF THE UBC, IS PROVIDED. OTHER DAMAGED ASPHALT ON SITE, SAWCUT CLEAN ALL ADJACENT ASPHALT IN REPAIR AREAS BEFORE PATCHING, Q <br /> 7. SUBMIT MIX DESIGNS, WITH STRENGTH AND SHRINKAGE TEST RESULTS, TO OWNER'S ENGINEER w <br /> U AT LEAST 7 DAYS BEFORE PLACING CONCRETE. ® CONTRACTOR SHALL INSTALL NEW.TWO-POINT FILL AND VAPOR RECOVERY SPILL CONTAINMENT. ^. <br /> 0 8. CONSOLIDATE CONCRETE IN PLACE USING A MECHANICAL VIBRATOR. G CO <br /> V 9. BEFORE PLACING CONCRETE, SECURE REINFORCING STEEL, ANCHOR BOLTS, DOWELS, AND wt G=, <br /> C OTHER INSERTS IN POSITION TO PREVENT MOVEMENT, Cd <br /> Cd 10. MATERIALS AND WORKMANSHIP SHALL CONFORM TO A.I.C. - 318 (SPECIFICATIONS OF THE : �� �- <br /> ^ — _ - DESIGN AND PLACEMENT OF CONCRETE) —\ <br /> E - -- - - - -_ _ <br /> U TK3 TK3-1 A Q c Cd <br /> �JJ � <br /> 8 NEW 6 <br /> MANHOL 4 I �. TL <br /> V Q C 1J,. <br /> r - _ - _ - - -�i` !:'r- ,�Y- - -�,,- - ` �. -•- -,{ -�%r '� - . - --r- s- ,i cd <br /> i ,a 1r`- r ':i- .:i' 1 , r,- �.-.�. -:i=-s'>,- � ��V = � "0 <br /> ry <br /> � C ^` <br /> d ( �•- .5 3 PRODUCT O �' C <br /> /I <br /> Q EXISTING PEAGRAVEL - - - J 'O 3C : EXISTING' PEAGRAYEL �Z U <br /> K MANWAY 'T0, REMAIN I 'C . .1 MANWAY TO R€MAIN; C O O . 5 <br /> p G _ <br /> DUIT <br /> E�.■{{ <br /> :. .. VENT VAP '.> lV C ~OO <br /> y <br /> I <br /> Z i - - 4" BLACK STEEL <br /> 17ERISERS TO REMAIN PLUG EXISTING NE�V TANK MANWAY, BY <br /> z / TANK BUNGS (TYPO 4 TANK MANUFACTURER <br /> U 3 / INSTALL RISER ISOLATION <br /> a / NOT BEING REUSED I \ ■ m <br /> Cc <br /> l 1 2 3 4 5 7 8 9 10 11 12 13 14 15 16 19 20 ■ � W , � N <br /> LAo / <br /> fy <br /> D_ - . \\ NEW TANK STRIKE NEW TANK STRIKE - maalerrebase to <br /> Q .\ PLATE BY TANK PLATE BY TANK / <br /> , . \ MANUFACTURER. MANUFACTURER / NO: ARCO PROOUCT8 OOWANY MASTIM FEVIBIONB <br /> w \ i _ <br /> a .. .\ - i�... '. ". NO. DATE :.fEVOOMB PROJECT L8_ EABE Prof eze. d slyn by <br /> z `,' ._ - _ '---- - 1/;9/93 0 U <br /> SMIRM <br /> .... CHECK <br /> a REieABE 0595 <br /> w Underground Tank Section - <br /> z ^ _ TK-3 <br /> 3' �1 <br /> w 2' 1 -0" <br /> ' ,. AR994/994TK-3 DWG ' <br />