Laserfiche WebLink
`TANK HOLD DOWN CALCULATION ( TESTING GENERAL_ CONDITIONS r10KOVNI'3, <br /> n F I.w uu: IIx. xs[.Suc M„ - A STATE CERTIFIED PRECISION -FEST MU 3F dE i' fir onmED PfiIOR 'FO COORDINATIONr <br /> T a woo 2 "I IIT[ 31 mcnr ci wnTER LINE <br /> PLACEMEW OF FINISH YARD MATERIALS. GOY(.\(,r ol\a IC BELL I COORDINATE IIiE WORK: DO NOT DELEGATE THE RESPONSIBILITY FOR �iO3Eft f H. LEE AND 1,.�i<.'C!A\(c3 <br /> REPRESEITTMWE 5 DAN'S PRIOR TO T :Tr _fO ARRANCY Pf1ODUCT COORDINATION TO ANY SUBCONTRACTOR, FABRICATOR OR SUPPLIER. <br /> r _�_ DELIVERY. <br /> 2 RESOLVE DIFFERENCES OR DISPUTES CONCERNING COGRONA PION, <br /> CONCRETE SLAB ---7 ;B i`< INTERFERENCE. CR EXTENT OF WORK. C'WiS UXI, <br /> 3 USE LARGE-SCALE LAYOUT DRAWINGS OF OTHER AFFECTED WORK, TO ('Jp]) 765_1660 <br /> f� <br /> r �1 .-� CHECK, COORDINATE, AND INTEGRATE RIE WORK TO PREVENT <br /> CON fAINMEN r REOU REMEN Iy'S r3r)f CIAI_ f IFT411R.� INTERFERENCES <br /> A COORDINATE WORK PERFORMED BY PACIFIC BELT. AND OTHERS AS IT <br /> / INVOLVES THE EXECUTION OF THIS WORK _ _- -_ -_ -_- �pEl jlR;l <br /> REOVIREU NOT-RECVIRED („ <br /> l { 5 COORDINATE DELIVERY AND STORAGE OF OWNER FURNISHED EQUIPMENT , ptip yAti�)Ky <br /> 0`A X SUPPLY (OR PRODUCT) SECONDARY AND FUEL FOR TESTING. FIRS Di]FRIC r' O IV <br /> CON TAINMFNTCALAVERAS <br /> L - - - - - - - - - -- - - - -- FI <br /> CUTTING AND PATCHING INCA 1 <br /> A RETURN (FOR GENERATOR) SECONDARY <� STEVFNSON pNE <br /> % _- _- -- iRY CI'FYOF '3TC<]i(FCI) R PfiEV=lfii(JII f <br /> _ _ -_ _ - / CON 7AINMENT 1 PATCHING SHALL SUCCESSFULLY DUPLICATE UNUISPJRBED ADJACENT 'PSD <br /> - --"--- - FINISHES, COLORS. TEXTURES AND PROFILES. � <br /> (2C}9) 9.57-3272 c <br /> o <br /> % (FT) y 2 COMPLY 'WITH LOCAL ORDINANCES A ANA THE REOUIR ULA IS OF CCR TITLE /y 3 <br /> {-- -- -- - -" -'-- - 4"'-12' _ ANNULAR VENT TINE / rd <br /> X 12" GONG CEAUMAN, MIWMUV -- 8, INDUSTRIAL SAFETY ORDERS AND CAL/OSHA REGULATIONS DO NOT // <br /> PLF1� ) G'11,01N A-A CVT OR ALTER STRUCTURAL MEMBERS W11HOUT PRIOR WRITTEN APPROVAL 1 <br /> 0110 <br /> OF PACIFIC BELL <br /> VENT LINE SECONDARY CONTAINMENT SITE -- `^ `X A. Ii4U <br /> C RI _ SHE LL_FT -._.-__...- ...__._..__-.- - - - -. <br /> I. ASSUMPiION� .. - S PERFORM CU TING. ASSOCIATED STRUCTURAL REINFORCING AND PATCHING IN y <br /> USED D"/"d" FACTOR A" A MANNER TO PREVENT DAMAGE TO OTHER 'WORK AND TO PROVIDE PROPER NAE ' A A 1'. A � O ` <br /> (TO BE USED VVIEN DEPTH OF 'WATER TABLE IS UNKNOWN OR FLUCTUATES. If Ir�IfiCl)u4'_IIFr\L NEAT Fri irPArll'.i:%_IiF z <br /> WATER TABLE )EII IS KNOWN RECALCULATE AS REOIJIRED.) G.D. SURFACES FOR THE INSTALLATION OF MATERIALS, EQUIPMFNT AND REPAIRS <br /> OAF ART. OF _ -- X -- VAPOR RECOVERY SECONDARY PERFORM DEMOLITION WORK IN SUCH MANNER AS TO PREVENT DAMAGE TO 3AN •JOAO INN COU1NI`Y / <br /> 1 VERTICAL SOIL RUPTURE SURFACE NQ TF_ VESSEL WATER CONTAINMENT EXISTING FACILITIES TO [REMAIN OR TO BE SALVAGED, AND TO PREVENT <br /> IF MOIRE THAN ONE SIZE TANK OR In. IU <br /> 2 NEGLECT FRE AT FORCE ALONG RUPTURE SURFACE. INJURY i0 PUBLIC AND WORKERS ENGAGED ON SITE UNDER THIS OR OTHER <br /> TYPE OF TANK IS USED ATTACH <br /> S. 'WATER TABLE SUNDERSIDE OF SLAB 12 43 9 GAL!CnY _ _ CAPACITY OF OVERSPILT_/RLL CONTRACTS. DEMOLITION DEBRIS SHALL NOT DE ALLOWED i0 ACCUMULATE <br /> 4 WEIGHT OF SUBMM ERGED PEA GRAVEL = 576 ADDITIONAL CALCULATION SHEETS q / CU F1. 67 CONTAINMENT BOX REQUIRED ON SITE. HAZARDOUS YORK SHALL NOT BE LEFT STANDING OR HANGING <br /> 5 'bEIGHT OF CONCRETE = 150p / CUU F 167. 16 87 OVEIRNIf>Hi OR WEEKENDS. (209) 453-3420 <br /> 6. WHERE MORE THAN ONE SUMP IS USED ASSUME THAT THE VOID IS OVER 18 110 <br /> COME BY THE '•WICHF OF TANK TOP EOUIPMENF 20 156 _._.._ ���._.._...�.._....�_--- - - - ._.._- 4 WHEREVER CUTTING AND [REMOVAL OF PORTIONS OF EXISTING WORK IS <br /> 7 SAFETY FACTOR - 1.'25, 22 165 INDICATED, SUCH WORK SHALL BE SAWN IN A MANNER THAT WILL PRODUCE <br /> 24 196 TANKS) IO BE REMOVED UNDER 11H8 CUIfT'riACT NEAT AND SIRAOHI LINES, PARALLEL i0 ADJACENT SURFACES OR PLUMB <br /> IF QIJ YA,YPY CALCULATION <br /> 26 250 FOR VERTICAL SURFACES. GRIND SMOOTH RESULTING EDGES OF CONCRETE <br /> - -.-.- --.. --. <br /> 28 267 SLADS OR WALKS. <br /> 10,000 5'•YF r;.VF_ <br /> u. DETERMINE TANK DIAMETER p = (IN )- _-- hO 30 306 ----- _-- - -- AIR POI_!MON CONTROL UiT'JVF`ril( F <br /> SZ 34g 5 NEATLY EST SE PORTI IN FINISH TO <br /> BACK i0 CLEAN STRAIGHTNEW UNE <br /> o. FIND FACTOR 'A' FROM CHART A = (LBS. /FT.) _.- 31_1$ - GALLONS TYPE QUANTITY ON NEAREST SUPPORT IN ORDER TU FACILITATE INSTALLATION OF NEW <br /> QALCU!ANE TANK UPLIFT U = (Ix L (LDS.) __- 84 ITN}_ 34 J')M1 r'\I I VOb\OUIy CG'1UN`FY .'\TCD <br /> 36 M1A1 MATERIALS, PATCHES OR REPAIRS EXECUTE CUTTING AND DEMOLITION BY <br /> J. DETERMINER 'A' 1 DIAMETER A - (LES 4'2 METHODS VA/ICH WILL PREVENT DAMAGE TO OWER WGRK AND 'WHICH MILL <br /> I FIND FACTOR N FROM UPLIFT <br /> A (IBS. J-E) 1 SB 492 <br /> AO 545 GALLONS TYPE OUANiitY PROVIDE PROPER SURFACES TO RECEIVE INS ULNA TION OF REPAIRS ANO NEW -------'-'-"------- -"-" - <br /> T CALCULATE GROSSf UPLIFT UI = A x (J-E) (LBS.).. .-_'2.001 - - K;Tuf <br /> 9. <br /> CALCULATE GROSS UPLIFT U + UI (LBS42 507 14CF2K18 784 . ) � 1 <br /> CA �1 A7F1'ICi _rrLWN FQIRCE 54 395 ---- - ----- 5 KEEP AREAWAYS, WALKS, CORT2IOCR5 AND STREETS FREE OF DIRT AND (�09) 463-3470 I�I�iI�II `JIA1 <br /> GALLONS TYPE OIIANTITY \ <br /> NOTE' 60 1226 RUBBISH. <br /> ,.I. <br /> a ALIGHT OF EMPTY TANK (MFG'S DATA) _ (LQS) la,}$O 1. HOLD DOWNS ARE REQUIRED EVEN 66 1483 <br /> 1, ',NEIGH( OF CGNC SLAB (X) (Y) (E) (150) _ (LBS.) _ _ SI!_ IF SAFETY FACTOR WITHOUT HOLD 72 1765 ._„_.N,,,LL, _-_ .,_ -__ -____-_ _-_ 7 REPAIR OR REPLACE IMPROVEMENTS DAMAGED AS A RESULT OF THIS WORK ')I E,E. I' IN��}...x <br /> V;FIG•IT OF BAIXFlLL (L) (D) (J-E) (57 6) _ (LBS. -.- --31r )-.- DOWNS IS GREATER THAN 7 25 18 2071 AT NO AUDI TION AL EXPENSE TO PACIFIC BELL <br /> 1 YrEf„IT OF DACKFILL AROUND TANK (DR/2) (.215) (L) (57.6) = (LBS) __ Ir�l_C.R�-_ 90 2602 <br /> ` "' ---- ` A 1 A 8 PROVIDE WATER DAMS AND OTHER CONTAINMENT PROCEDURES, AS <br /> TOTAL HOLOUQWN FORCE WII'HOUi HC{U DOWNS = (105) 10},x¢} 2. WITH <br /> SAFETY FACTOR IS 2 1.25 CK 35 3136 I"ANK(S) FO BG INSTALLED LINTER Ti'{,3 W1fFRAGf <br /> WITH HOLDOCWNS T02 J�h2 NECESSARY. FOR CONTROLLING WATER USED FOR CONCRETE SAW CUTTING R ,.- <br /> D:9 COAnR CAS s c_rOfiT: '(OU DIO <br /> HOLO DO'hN FORCES _ 105,855 _ 106 3971 IO.+}:Q FR•l f,0;A F7NG I;NF 3 NOTE - 4 FOOT TOR SHALL BE IND TA K E AV REPAIRING ASPHALT P-1 SITE j jr?.C'r_T <br /> SAFETY FACTOR= - _ 1.24 :A htC4T sC+_DCIy:;NS -- - - ------ -- - WITHIN A AFOOT PERIMETER AROUND TANK EXCAVATION AT NO ADDITIONAL GROSS UPLIFT 86.272 `- 114 4425 GALLONS TYPE DUAN nT'i EXPENSE i0 PACIFIC BELL , - ( . A f- A ..,,, . , I _ P--2 SITE PLAN <br /> 120 4903 UNE-,cfi riOTJI ID S. ii Pl;;� ,\_•�Ffi-• <br /> ',RETORT OF UEADMAN (Q (Q (L) (150-62.4) (2) _ ((LBS .--- - 474 126 5405 -_- _ - _ -- P-3 TANK `pFC OON SLAB <br /> Er ?LAN AND UE TAILS <br /> f 'NEIGHT GF SOIL ABOVE CEAUMAN (Z-E) (L) (57.6) (2) = (LBS _ 9 tap 5932 P-4 TANK :4YD PIPING UE L111_S <br /> 138 54;34 GALLONS TYPE QUANTIFY <br /> TOTAL HOLODOWN FORCE WITH HOLD DOWNS = (LBS.) 1133X3 X44 1f1T.0 P-5 TYPICAL TLS .550 INS TAI.[-A TION <br /> .!GTO UQAN FORCES WITH CFADM A,V '.M1S 835 1.60 -----_-__. .___...... ........- __--_ -(J $r(.(.IFI .! TONa <br /> SAFETY FACTOR- - _ - _ - ShiE TY FACT4R ,fl 111 {iC1_DOQANj GALLONS 'TWE -DUAN LI TY <br /> GROSS UPLIFT 86,272 <br /> YI1'T{)-F3h2A �12A �AIFIy NIA T ' `- <br /> N seuT1+FRN <br /> GENERAL NOTES SCOPE OF WORK <br /> 1. CONIRACTOR TO FURNISH ALL LABOR, MATERIALS, EQUIPMENT AND SERVICES NECESSARY FOR I. SCHEDULE A METHOD CF PROCEDURE (MOP ) MEETING MTH PACIFIC SELL <br /> !HE SATISFACTORY COMPLEIICN OF ALL WORK CALLED FOR OR REOUIRED BY IHE DRAMNGS FACILITY ENGINEER At A MINIMUM ONE WEEK IN ADVAACF :'.F PROPOSED <br /> _ <br /> AND SPF.CIFICA IiGNS <br /> CONSTRUCTION START OAIE. <br /> 2. ALL NORK SHALL BE PERFORMED IN ACCORDANCE MTH ME CURRENT APPLICABLE UNIFORM 2, CALL UNDERGROUND YRVICE ALFRT (U.SA.) AT A MINIMUM OF 48 HO0'> <br /> PRIOR t0 START OF ONSTRIJCTON. <br /> BUILDING CODE, UNIFORM FRE CODE, NATIONAL ELECTRICAL CODE, CALIFORNIA UNDERGROUND <br /> STORAGE TANK REGULATIONS, CAI -OSHA CONSTRUCTION SAFETY ORDERS AND ANY OTHER 3. SAW CUT AND REMOVE EXISTING CONCRETE TANK SLAB, <br /> ), <br /> AND AC PAVING AS NECESSARY TO EXCAVATE AND REMOVE (1) F <br /> APPLICABLE STATE, CITY, OR COUNTY ORDINANCES. C C.F <br /> ri(..If I�i L�F.�L_I CI A�_iI) IF 1 <br /> tU 000 GALLON F10ERGLA55 ONCE RGRUUNU FUEL STORAGE <br /> J. CONTRACTOR SHALL PROTECT ALL EXISTING FACILITIES 10 REMAIN UNLESS NOTED OTHERWISE TANK, ALL ASSOCIATED EQIJIPMFNT AND PIPING IN ACCORDANCE MIH ------ ------ - - --" - -- <br /> CGNIRACTOR SHALL REPAIR OR REPLACE ANY EXISTING FACILITIES WHICH ARE DAMAGED BY THE UNOERGROGNp TANK REMOVAL PROCECVI2E ON SHELL P-6, <br /> THE CONIRACTCR'S OPERATIONS i0 THE SATISFACTION OF THE OWNER. 4. REMOVE EXISTING CONCRETE DISPENSER ISLAND, DISPENSER. VENT RISER, ,AND <br /> ALL ASSOCIAIED PIPING AND EQUIPMENT <br /> 4, THE EXISTENCE OF UNDERGROUND UTILITIES 15 UNKNOWN. IT SHALL BE THE CONTRACTORS i. REMOVE EXISTING TLS-250 LANK MONITORING PANEL. LOCATED IN OFFICE %:ifE�1F it%CILIA <br /> RESPONSIBILITY TO DE/ERMINE ME EXACT LOCATION(S) AND/CTR EXISTENCE OF ALL UNDER- BUILDING AND TURN OVER TO PACIFIC BELL. <br /> GROUND UTILITIES IN WORK AREA. PRIOR TO EXCAVATION, CONTRACTOR SHALL UTILIZE HIE 6. INSTALL ONE NEW IO,GCU GAL :i7EF.L DOUBLE WALL UNDERGROUND (916) 972-?401 <br /> SERVICES OF A INDEPENDENT UTILITY LOCATING SERVICE FOR FIELD MARKING OF UTILITY LOR:A➢ONS. UNLEADED FUEL STORAGE LANK AND EQUIPMENT PER DRAMNGS <br /> 5. ROBERT H. LEE & ASSOC. SHALL APPLY AND PAY FOR ALL PERMITS REOUIRED FOR ATE COMPLETION AND MANUFACTUIRER'S INSTALLATION INSTRUCTIONS SEE SHEET <br /> P-3 FOR EQUIPMENT FURNISHED BY PACIFIC BELL. CONTRACTOR SHALL <br /> OF THIS PROJECT CONTRACTOR 70 SUPPLY CERTIFICATE OF INSURANCE, CITY BUSINESS LICENSE, PROVIDE ALL OTHER MA TERIAIi, LABOR AND F.OUIPMENI FOR A CGMPI FIE <br /> EVIDENCE OF CONTRACTORS LICENSE AND ANY OTHER INFORMATION WHICH THE PERMITTING AGENCY SYSTEM CONIRACTOR SHALL COORDINATE WITH SHIELDS, HARPER ANL` --- <br /> REQUIRES FROM CONTRACTORS. COMPANY FOR DELIVERY OF OWNER FURNISHED EOUIPMENL AND START UP <br /> OF TANK MONITORING S'fjIEM, <br /> 6, GENERAL CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY IF SITE CONDITIONS OR DIMENSICNS <br /> DISAGREE 'ATIH INFORMATION SHOWN ON THESE DRAWINGS. WORK IS NOT TO PROCEED UNTIL 7 INSTILL ONE NEW SINGLE PROAUCr, ['40 HOSE SUCTION DISPENSER, VENT <br /> RISER, AND AIR 'WATER BOX ON CONCRETE DISPENSER ISLAND- STUB <br /> SUCH DIFFERENCES ARE RESOLVED UP NEW ELECTRICAL CONDUIT FOR FUTURE CARD READER, <br /> 7 CONTRACTOR SHALL COORDINATE MM THE ENVIRONMENTAL CONSULTANT AND PACIFIC BELL FOR DISPOSAL 8. INSTALL NEW 1 1/2- ENVIROFLEX PRIMARY PIPING WTIUN 4" ENVIROFLEX <br /> OF TANK, PIPING AND RELATED EQUIPMENT AND THE TESTING FOR CONTAMINATION. SECONDARY CONTAINMENT PIPING FOR PRODUCT LINES. <br /> 3 CONTRACTOR i0 PULL. TANK AND LOAD ONTO TRUCK PROVIDED BY ENVIRONMENTAL CONSULTANT. 9. INSTALL NEW 2" FIBERGLASS VAPOR RETURN AND VENT PIPE AND BLACK IRON <br /> VENT RISERS, ATTACH NEW VENT RISERS TO NEW VERT RISER .STAND. <br /> 9 PACIFIC BELL ENVIRONMENTAL CONSULTANT SHALL BE RESPONSIBLE FOR ALL SOIL/GROUNDWATER SAMPLING 10 INSTALL NEW ILS-350 TANK MONITORING PANEL 'WITH LIQUID SENSORS, LEVET. <br /> AND ANALYSIS, ENVIRONMENTAL CONSULTANT SHALL TRANSPORT AND DISPOSE OF TANK, PIPING AND ALL GAUGE AND ALL ASSOCIATED EOUIPMENr, PER DRAWINGS AND SEAL BY LOCAL ENCWEER <br /> TANK EXCAVATION SOIL AND GROUNDWATER, CLEAN OR CONTAMINATED CONTRACTOR SHALL DISPOSE OF MANUFACTURERS INSTALLATION INSTRUCTIONS. PROVIDE AND INSTALL A STEELIT I --' --- -- <br /> BROKEN ASPHALT AND CONCRFiE. DEBRIS AND MISCELLANEOUS EOUIP!dENL CONTRACTOR SHALL LOAD ':011_ ENCLOSURE BOX ON THE WALE. UNDER THE PANEL TO HOUSE THE EXISTING .j 1 Ji'liA I L 11"Li1 i <br /> ONTO [RUCK PROVIDED BY ENVIRONMENTAL CONSULTANT MODEM. <br /> 11, INSTALL NEW CONDUIT AND CONDUCTORS AS REQUIRED FOIR MONITORING <br /> Ts). ,,0141RACTOR SHALL PROVIDE A DETAILED METHOD OF PROCEDURE (M O.P.) 10 PACIFIC 13EII EQUIPMENT AND DISPENSER POWER EXISTNG CONDUITS MAY BE REUSED <br /> FOR APPROVAL PRIOR TO START CONSTRUCTION FROIA TLS PANEL TO 'ANK AREA <br /> ii CONTRACTOR SHALL SUPPLY PACIFIC BELL WITH A DETAILED WORK SCHEDULE AND UPDAIE PROGRESS 12. PERFORM PRESSURE IES15 VN NEW TANK AND PIPING IN COMPLIANCE ',MTI+ I --- -"- - - <br /> ANO/OR CHANGES ON A WEEKLY BASIS. THE FOLLO'MNG <br /> XI 12 CONTRACTOR SHALL PROVIDE THREE SETS OF SUBMITTALS ON ANY CONTRACTOR SUPPLIED EQUIPMENT A MANUFACTURERS INSTRUCTIONS FCR TESTING. -- <br /> r 70 THE ENGINEER PRICK i0 START OF CONSTRUCTION B. 1991 UNIFORM FIRE CGDE SECTIONS 19.605 AND 79 703 <br /> C. CALIFORNIA UNDERGROUND STORAGE TA4K RF-GULATIONS <br /> 13. CONTRACTOR SHALL BF RESPONSIBLE FOR SUPPLYNG THREE COMPLETE SETS OF OPERATION, SEC <br /> Tic 2635 r5) (1) - .._._ _. .�.. '. .... <br /> MAINTENANCE AND TEST DATA. WHICH SHALT_ INCLUDE" 0. PRECISION TEST OF PRODUCT LINES AND TANKS, t <br /> x� E. A.Q.M D. vEQUIREU SOURCE IL;r - ISSUED FOR 31I0/PFRMI T <br /> A) ,ALL MANUFACTURER'S LITERATURE, SUBMITTAL DATA COPIES, INSTALLATION, _ 4 <br /> OPERATION AND MAINTENANCE DATA ON ALL EOUiPMENT AND DEVICES I3. AFTER TNG TRENCIONH <br /> OF ALL WREST NI TESTS BACKFILL TANK R NEW EXCAVATION � YO-�- RE'ASICN / AUTHORIZATIONS DATE , BY <br /> iU AND PIPING TRENCH (0 SUBGRAJE WITH PFAGRAY'FL AND PUUI2 NEW <br /> INSTALLED. THIS IS TO INCLUDE FANKS. SENSORS, 'r4ELLS, PIPING, PUMPS, CONCRETE TANK PAD. MAINTAIN EXISTING SITE DRAINAIGF. '- <br /> r DOUBLE CONTAINMENT SYSTEM, SUMPS, AND ALL OTHER INSTALLED ACCESSORIES 14 INSTALL AN ELECTRICAL OUTLET ON THE EXISTING IVDU OF THE BUILDING <br /> AHICH IS WIRED IG THE ELECIFICAL PANEL SERVICING THE FUFIING "r- <br /> :Y B) ,ALL TEST RESULTS INCLUDING BUT NOT LIMITED TO PRESSURE AND/OR LEAK TESTING <br /> EOVIPMENT TITS '•RILL ALLOW PAC BELL i0 BRING A PORTABLE GENERATOR <br /> `n C) ALL PERMITS, COPIES OF SIGNED-OFF PERMITS FROM ALL AGENCIES INVOLVED TO THE SITE NVD POWER UP THE FUEL ISLAND iN THE EVENT OF A <br /> POWER OUTAGE. <br /> D) COPY OF CORRESPONDENCE M61 VARIOUS AGENCIES CONCERNING THIS PROECT. 15. PATCH AND REPAIR EXISTING ASPHALT PAVING [THERE UISIURHED BY NEW DRAMNGS PREP;A'vEL ECR <br /> E) ALL DOCUMENTS AND DATA SHALL BE INSTALLED IN A [RING BINDER AND EACH 'WORK 10 MATCH EXISTING RESTORE PARKING SPACES TO ORIGINAL T C' ,,.. C' \/ jl T T � I �, <br /> SECTION APPROPRIATELY IDENTIFIED. OUTSIDE COVER SHALL CLEARLY IDENTIFY CONDITION. (� I\ /I ( <br /> JOB LOCATION AND DATE, 15. UPON COMPLETION OF CONSIHJCTON, CONTRACTOR SHALL ARRANGE A FINAL SACRAMENTO, CALIFORNIA <br /> F) AS-BUlli DRAWINGS WALK THRID SITE INSPECTION WITH PACIFIC, BELL AND ROOT. H. LEE 4 ASSOC FACIU T'/ ADDRESS <br /> 11, PROVIDE AI_IERNAIE 131D TO REMOVE EXISTING TANK HOLD-DUAN SLAB <br /> T5. STOCKPILE OF DIRT SHALL BE COVERED COMPLETELY 01H PLASTIC FARP, ANCHOR AND SECURE /raj ` ) '��(J.`�'1/ rC' m I ��� \( '1 <br /> PLASTIC TARP FIRMLY TO PROTECT FROM THE ELEMENTS. (J J ! _/\ I _ !f <br /> 15. ALL ELECTRICAL 'WCI2;< i0 BE GONE IN COMPLIANCE WITH CHAPTER 5, ARTICLES 500-50 AND 514 j 1-O(�I< r`)I\�1 �_,/i'`F.�If-'��F-�I\I�i\ <br /> ,1 OF ME NATIONAL ELECTRIC CODE. SEAL ALL CONDUITS AS REQUIRED UNDER ME CINE. NOTE A <br /> NO GALVANIZED PIPE OR FITTINGS FOR DIESEL SERV,CE MU. BE ALLOWED TANK SYSTEM TO BE INSPECTED BY LEAD AGENCY AT FOUR SEPARATE PHASES -_-"'- -- - - <br /> 16. - (DATE ,31 GC I ?I ORAWN BY <br /> r} 1. SETTING OF T•RE TANK -THIS SHALL INCLUDE IHE SOAP TEST, HOLIDAY TEST . ..�.. ..- _ _. <br /> 11 ALL CONDUIT SHALL BE RIGID TYPE WITH THREADED CONNECTORS AND BE WRAPPED FOR CORROSION OR pRESSU iF ACUV!d IFSi (1 NECKED BY: J. \1cC,RA TF1 <br /> /V P OJ%'CT ENGTNFER <br /> PROTECTION TO A POINT ABOVE GROUND LEVEL. NO DIE CAST, PVC, OR PLASTIC ELECTRICAL CONDUIT 2. PRIMARY PIPING AND TANK SYSTEMS INCLUDING VENT, VAPOR LINES, RISERS, - <br /> 'J <br /> OR FITTINGS SHALL BE USED USE ONLY STEEL CONDUIT FITTINGS. ETC" 1ESTARO NO SHEET 1 GF 6 SHEETS <br /> S. INSPECTION OF ALL SECONDARY CCNTAINMENT TO INCLIJOF SECONDARY PIPE - -'-- <br /> U 18. NEW TANKS AND PIPING TO BE TESTED IN ACCORDANCE MFH APPLICABLE REGULATIONS AND PRESSURE EST. CORROSION PROTECTION, AND DISPENSER CONTAINMENT BOX APPROVED DRAWING NO. <br /> Z <br /> SPECIFICA BONS. 4. FINAL SYSTEM lN'SPEO'11(NN AYIIICNI INCLUDES ELECrRiCAL, MFC 4IANICAL ANU <br /> ALL PCRUONS OF THE LEAK DETECTION SYSTEM AND GIBER %*AffGRING <br /> V <br /> SYSTEMS MANAa)ER <br />