NOTE!
<br /> CONTRACTOR SHALL COORDINATE WITH PACIFIC BELL TO HAVE rank:
<br /> PRODUCT TAGS INSCRIBED WITH TANK SIZE (CAL'S), MAX FILL Made"' Nliding, steel plimuly, to,,k ith secondary
<br /> to, CAPACITY (GAL'S), AND FUEL TYPE. conlaament by , st,,E/frb4rGF25S reinforced plastic
<br /> r", Composite Secondary tank, UL approved Three 43' did
<br /> > containment darns, 1/4" steel plate bottom protectors unser
<br /> 2 eoch bun-) opening, leader, lank stick, tie–dans )aide, and
<br /> OBSERVATION WELL, SEE<34�-
<br /> polyethylene Separate, Provided by tank marofoetw"'r.
<br /> CHAMFER r B" rHICK REINFORCEO CONCRETE SLAB MTH hr4 13EBAR 0 12' O.G. BOTH WAYS T, RIP1119 S"InP. Alrei"I'M Cont0lolnert fb,,gtoss prying
<br /> ;Po 9 sump
<br /> 9 42' ]iometer 11th AY diameter nser. Car or extend to
<br /> 3- MIN 5- MAX (TYPAT PERIMETER)' heiqlht�n field to bury a,pp, Cl.,tr,,t,, to order
<br /> _ I eiHensions If n,,e-.sa,y
<br /> ALL BUNG 1PEINING5 ARE
<br /> Q 5.1-P Lid PHIL-THE sump shield
<br /> f IN P,T. UNLESS NOTED 33 da,'neter, match filling configuration.
<br /> L--COLD KEY CONSTRUCTION JOINT AT SLAB OTHERWISE k Mari It NIT for gasoline tank:
<br /> ZIL L I MIDPOINT FOR TANKS OVER 3000 GALLONS ---FILL SPILL CONTAINMENT BOX PHIL-RIE SC 3600-rsc (5 golon)
<br /> 1% FII Cap and Adaptor. F.m�o Aleat,o Nj, -GQ5 ,p ,u E,,,,
<br /> Q
<br /> _FILLER CAP AND ADAPTER CD --Ab
<br /> Alo-014 a11J lacte,1 4' diameter adc.pter.
<br /> —OUTLINE OF II Ol
<br /> TANK BELOW --PHASE I VAPOR RECOVERY ASSEMBLY 200 Fill Drop Tube! Emco Wheaton A20-.004, ubme,,;,,j
<br /> 36' MULTI PORT MANHOLE WITH deep Cold cut C�mtl�bctor $11,111 order to fIt proper
<br /> LIQUID TIGHT FILL BOX —LID. TAG tank 6c'nete,
<br /> FILL ASSEMBLY, SEE to\, To" -1 1/2- ENVROFLEX 0 _PPIE-rHE SUMP SHIELD N 07 Angle Check Valve, Double Poppett. Em-co Abecon A563-0011
<br /> Iv-
<br /> HQUU(j Pipiria
<br /> /f/1 FFQqSUCTI*N TUBE il 03 E.t,,,t,, Bull Foat Universal 37-2C6016 %llh Uri,e,sol
<br /> RISER AT SUCTION TUBE
<br /> 1421-20-20 extfor hQpsinG
<br /> OUTLINE OF SUMP BELOW X 12' DEEP L ;iI Took level Probe/Overfill Alarm 4 DO percent. Veede,-Rot
<br /> WAIFR-TGHT 30: L f/
<br /> OUFLINE OF CROWN A' CONCRETE MAN'NAO SEE(17)
<br /> �_j
<br /> Uq,id Detector Sensor: TS3r1O sensors lith cable, to
<br /> -PHASE I VAPOR RErURN FOR GASOLINE ONLY, SEE 200 - TANK LEVEL RISER
<br /> K AND PRO19E
<br /> T Riser P,pe: GOTIOnized 1111d.e 40 for gesoline
<br /> _R OF TANK
<br /> LI #4'S AT 45' ANGLE AROUND MANHOLES (rcP BUNGS EXPLOSION PROOF =�--.� <1�2) Not Used
<br /> 3" C R, J` BOX (7YP,) 11
<br /> (TYR 01 Fie. connector. 1 -112' dpaete, 12" song rltefle.
<br /> 2' IGF R P VENT 0 PIPING SUMP WITH 33' A 110165-24-0120 for 2" diameter 12' long fle� con,jectus,
<br /> RISER. SEE02
<br /> LINE TO VENT RISEE tltelle- 110165-32--0120 mole x role s,,Nei Titafl,. c,Iy,
<br /> SEAL-CFF no equals
<br /> ANNULAR POR`rMONHoR, LOOP 3/4'C, TO 'J' BOX AT (14) Manhole role, al Arnud, Monitor Uni,e,st 08-1810, 18"
<br /> 13' 0 MANHOLE BOX FRAME AND JI I ANNULAR SPACE RISER 2" A FR P FOR PHASE 11 VAPOR diameter.
<br /> sen$01 rise, cop and adaptor kit
<br /> COVER, SEE -4- VENT/TL SUMP ' �22 RETURN GASOLINE ONLY ix
<br /> 61., r,ser Cu ;p 4" diameter torealled cop .lith extractor J/4-C. TO SUCTION/ <1 5) Annular Coo VIed,r Root
<br /> NO CHAMIER IF LOOP PIPE PENETRATION 0 SUMP. BULKHEAD top fillin �tor &rencll
<br /> T_ ALL-AIROUND, FOR SiNGLE TANK 7'-0" ADJOINING OTHER WITH PIPE NSFRI� SEE 1, n17
<br /> MIN �F �7
<br /> • WOF WHERE ADJOINS ADDITIONAL TANKS TANK SLABS- SUMP SENSOR PROBE. SEE MTrhale at ',uctcn/vent end 1 98 -3610 3G' jlomator
<br /> 7 100 01 3
<br /> USE COLD KEY CONSTRUCTION JOINT - x tu skirt, reinforced cave(, scle,S, gasket and poll
<br /> - - - - - - - - - - `_�4 handle
<br /> - - - - - - - T- -1 �1� &�
<br /> 4' 0 CALM. RISERS FOR GASOLINE,-- FIBERrILASS SUMP TO CONTAINMENT DAM overfill Prevention Valve: Emco lYhecton Guardian A1100-001,
<br /> J BLACK IRON FOR DIESEL, SEE cl 1)02 PER SUMP MANUFACIURE[I SPECS. - - - - - ___ I
<br /> (19) duct D/Copacity ",g. '"de star,ped plate 'ith ip,od�ct
<br /> CONTAINMENT DAM PROVGED and Capacity 56U lo,
<br /> 2'-0* WIDE MIN SPACE F= BY TANK MANUFACTURER.
<br /> TO ADJACENT TANKS C2 0) phase I vapor ceco%ery assembly. Emco Wheaton A99-002
<br /> Cop ith A76-005 odapio,
<br /> X 01 8P!lkheons fitt:n,;, and connectors To, Nhergbiss piping
<br /> VERIFY DIMENSION WITH--_-
<br /> Total containment flat bulkhead fitting TL3L'&30
<br /> Total rontainment 2" pipe Insert CS3920
<br /> TANK FURNISHED 4' X $ 2' EXTRACTOR/BALL 'JAI-VF Total Contp,nment 3' pipe ,,art C53930
<br /> AT VAPOR RECOVERY EINE, GASOLINE
<br /> ONLY. SEE /-�'\ CONTRACTOR TO 4, 02 Bulkhead (4ting for conduit.
<br /> I roto ('onto'
<br /> ...rent 3/4' flat talkhend GHnj F31000
<br /> SUPPLY EXTRACTOR AVRFNCH /2 `\ Pump Island Containment be,, Total Containment DU2614
<br /> 4) Suction pump, Tckhelm 7552 TW-2 twin
<br /> OVER FILL PREVENTION VALVE 108 Y ' Complete with n012k!3, hOSeS, 10ile retractors, U]Sor, etc
<br /> /;5\ PRIMARY PIPING: PRIMARY PIPING SIZE VARIS-, IFE
<br /> NOTE V y SHEETS P-1 AND P--2 TO CONFIRM _I/FS
<br /> SEE SITE PLAN FOR 1/2' ENVRCFLEX #PP0500
<br /> FUEL PIPINC 5I7C 3/4' ENViliCILLEX #PP07M
<br /> TANK SLAB PLAN 1 ' ENVIROFLEX KPPIOOO
<br /> SCALE 112"=I'-O"
<br /> ENVIROFLEX Ppl5oo LV FILL VAPOR RECOVErrIM9UM10 DETAIL SCALE
<br /> 2- FNVINOFLEX JPP2000
<br /> ------- y SECOND-IRY PIPING PRIMARY PIPINGSIZEVARE'�, SCE
<br /> SidrErS P- 1 AND P-2 TO CONFIRM SIZES
<br /> IN WET HOLE OR UNSTA13LE SOIL CONDITIONS- 4" EN`vIROFI EX ESP 4000 r (A k_
<br /> INSTALL FILTER FABRIC LINING AT TANK
<br /> ti (271) ENVRCTIEEX PIPING BULKHEAD HITTING
<br /> HOLE ON ALL SIDES AND BOTTOM LAP FOR ROUND $UNIT) USE
<br /> AT TOP OF EXCAVATION A MIN OF
<br /> REINFORCED CONCRETE SLAB 2'-0" PLACE PRIOR TO INSTALLATION TOTAL CoNFAINVIFNI, �Ca,%50 AT PRODUCT LINE
<br /> 12' MIN rROyN WIDTH (PN.) OF DEADVAN. TOTAL CONTAINMENT #CB.3950 AT vCNr LINE
<br /> OR FOR FLAT FACED SUMP USE
<br /> TOTAL CONTAINMENT #C9.650 AT PROCUOT LINE
<br /> TOTAL CONTAINMENT JC;33950 AT ',ENT LINE
<br /> —ANNULAR CAP' SEC 0
<br /> C. j XES
<br /> .. FOR P03-3 -3 MANHOLE AND COVER, ICE n17 23 TEST DONUT Total Containment, ,2e varies
<br /> MONITORING PT;IBES HIGH CRO," (TYP ) D Not Used
<br /> CONCRETE AROUND MANWAYS A (2�
<br /> CONFIRM HECHT WITH
<br /> PACIFIC 12ELL ENGINEER ----_, RISER 4' 0 GAIEV� FOR i C3 0) Steel land Turco, 44.15L.73'h 6'R
<br /> GASOLINE W14i EXTRACTOR WII Water
<br /> TOP CAP. SEE Own #1005
<br /> !t A,11 d,t,pr,,,,
<br /> 1019
<br /> SUMP LID. SEE 02 Vent Cnas, Go,,j;I
<br /> -- - - - - - - - -- - - - - - Q
<br /> LJ
<br /> to I 'C. WITH SEAL-OFF
<br /> 6 FROM "J' BOX TO PHASE I VAPOR Sheol VaNts, E Vi #A60-002 for ,ogi,ct ,,d .par plpirq
<br /> E MONITOR PANEL
<br /> RE TURN LINE T, Obse,,ation ,cell kit lMIhJ1Tn4) sIotled p,C poo, orkng
<br /> �Olp ),To molhle
<br /> 2' 0 PVC RISER 12 20 BARRIER
<br /> 10 0 MIL POLYC THYLENE VAPOR
<br /> FOR ANNULAR PCRT .1 9 l'- Q' FROM GRACE t
<br /> li
<br /> CONTRACTOR TO PROVIDE RISER -Itenos marked 1�01 an, a,te,.,k are f,,o,shed by l,raj,.
<br /> TANK LEVEL RISER AND PROBE. '�PE
<br /> T (g) nstniled by contractor, "I ss noted oth,�,1,5e an d,o,�...
<br /> 'i , ra �oa.. SIZED PER VICCER ROOVS
<br /> la REQUtREMENTS SEE SHFEr P-5,
<br /> NOIC
<br /> lu 47, EN%nRCFLfX PIPING SHALL BE I AS PACIFIC-BELL STANDARD
<br /> FIBER _ASS CONTAINMENT SUPPLY At RETURN SHAIL BE USED ONLY
<br /> Q SUMP SENSOR PI CBS.- II RE
<br /> SEC BULKHEAD WITH P1 N14EN REQUIRPO BY 'ITE CONDITTONS GIR LOCAL AGENCIES.
<br /> In f0 it I INSERT, SEE 202
<br /> P ANNULUS I FURNISHED WITH TANK. INSTALLED BY GENERAL s Y� l II�',IV dd
<br /> AT ANNULAR SPACE SEAL-OFF
<br /> CONTRACTOR PR09E RISER.
<br /> Iiii I
<br /> R-4
<br /> I STAINLESS STEEL HOLD DOWN LADLES BY GENERAL. EXPLOSION PROOF *J" BOX (T)p)
<br /> ion
<br /> IN 2 0 NPJ BUN( CONTRACTOR, FELT SEPARATOR AND CABLE GUIDES LOOP 3/4`C. TO -j` rArIN
<br /> BOX
<br /> 2" 0 GALV SUCTION—
<br /> TUBE FOR GASOLINE,
<br /> QQ ALUMINUM SVeMERCCO FILL DROP BLACK IRON FOR DIESEL (rToP 0 SIDE-, ANGLE CHECK VALVE
<br /> 1 1/2- ENVIRrFILEX PRIMARY PIPING
<br /> TUBE, SEE BOTTOM
<br /> INTERNAL STRAINER L42 -ENVIROFLEX SECONDARY PPING
<br /> PIPE PENETRATION 0 SUMP BULKHEAD
<br /> STEEL WALL UNDERrROUNO PRIMARY STORAGE TANK MIN WITH PIPE INSERT AND TEST REDUCER r
<br /> WITH STEL/FIBERGLASS kE;NFCRCEO PLASTIC SEC
<br /> COMPOSITE SECONDARY TANK CONTRACTOR MIX".
<br /> SILEO FOR ESD/1FRMJT 4,101
<br /> TO VERIFY EXACT SIZE OF TANK PRIOR
<br /> TO PROVIDING A BIC' QUOTE. SEE
<br /> ENMROFLEX FLAT BLEXTEAL, FITTON(,
<br /> T_ RE 1 NS' AUMORIZATIONS DA IF U
<br /> —IN-TANK GAUGE PROBE Q
<br /> CON W/90% OVERFILL ALARMIII 42' 0 X 33" A FIBERGLASS
<br /> FIELD CUT 41)
<br /> STEEL PROTECTOR (TVP, OF 2) PER MrR'S REOMNVS.
<br /> TRACTOR TO CALIBRATION, INSTALL REDUCING PIP114G SUMP W/ LID f, TANK �)lr CTION/f:31
<br /> III 20" SQUARE X 1/4 THICK FURNISHED TANK F E
<br /> `,, 3OTTOM BY TANK MANUFACTURER —-_ SEE (FT? OF 2)
<br /> VIJ LAIN AND OF. AIL'%
<br /> MAXIM SLOPE TANK 1/8" PER FOOT DOWN TOWARDS MONITORING
<br /> UM __ - ENMF40FLEX 1 1/2 2 iEsr DO Jr� TANK)
<br /> Mjjl PROBE AT ANNULAR SPACE (CW301 _INc
<br /> 0 NPf ADAPTOR --
<br /> SUMP SENSOR PROBE, SEE
<br /> )RAWNGS PREPARED FOR
<br /> ENVIROFLEX COUPI INT VENT LINE FLEX CONNECTOR, SEE
<br /> LENGTH TO 20, WASHER C3) V N1
<br /> MATCH TANK E,
<br /> I' X I" X 2' EXTRACTOR/ t_
<br /> SACRAMIENTO, CALIFORNIA
<br /> BALL FLOAT IJ VENT LINE
<br /> SEEr.�,
<br /> ------ 270" -PEA GRAVEL BACKFILL \2j
<br /> 0
<br /> TO --LIQUO DETECTOR PROBE AT (TYPICAL)
<br /> ANNULAR SPACE ELS-350 -eo-5d IN!,::�\/\f-rom IHOAD
<br /> SEE(0,j
<br /> N 11�-Olr 11\11 A
<br /> -IU O _�,` - I
<br /> —PRECAST CONCRETE DEADMAN. KTOINI, ( N
<br /> PER TANK, FOR SIZE SEE TANK
<br /> 1 TANKS ARE SHIPPED WITH VACUUM PRESSIUJ�E ON ANNULUS. VERIFY THAT VACUUM IS INTACT PRIOR TO INSTALLATION HOLD DOWN CALC'S AND ------ --
<br /> [DATE 1O/lg/-j4 DRAAN PY If.I.
<br /> o 2 PERFORM A STATE CERTIFIED PRECISION TEST PRIOR TO PLACING FINISH YARD MATERIALS,
<br /> SEE TESTING REQUIREMENTS ON SHEET P-r, CIO, NOTE: ENVRCFLEX PIPING IS APPROVED FOR PROECT FiNUNCEN CHECKED D,; J McURAII-1
<br /> PRODUCT PIPING ONLY. USE FIBERGLASS
<br /> PIPING. JEST/RO Na 3 OF 6 SHEETS
<br /> z PIPE FOR VAPOR RETURN AND VENT P
<br /> Or
<br /> SCALE; 112"=I'-0' y SUCTION VENT / TANK L VEL COUMPSCALE Y_
<br /> MANAGER