Laserfiche WebLink
E. Reporting Formffor monitoring (continued) 0 <br /> The TLS System has four modes of operation-Leak Detection,Tank Inventory Detection, <br /> Interstitial/Piping Sump Leak Detection and Automatic Delivery Reporting. When the leak monitor <br /> mode is activated, the TLS System continuously monitors fuel levels in each tank and can detect <br /> losses of 0.2 gph. A hourly report on each tank shows temperature-compensated inventory <br /> changes to 0.1 gallon based on inventories when the tank leak mode is initiated. The Leak Monitor <br /> is activated through a push-button mounted on the front panel,or remotely through the RS-232 <br /> Telecommunications Interface. <br /> The Tank Inventory Report presents the current status of each tank. It provides station location, <br /> date and time,volume and level of fuel,water level and temperature. <br /> Interstitial/Piping Sump Leak monitoring will be provided using two liquid sensors placed in the <br /> double-wall tank annular space and in the tank manhole space. The LED display on the TLS <br /> console will flash indicating the alarm cause and location. <br /> The Automatic Delivery Increase Report features are generated two minutes after fuel is delivered <br /> to the tank. The printout includes date,time,volume and temperature before and after the increase <br /> and the net increase of inventory. <br /> F. Describe the preventive maintenance schedule for the monitoring <br /> equipment. Note: Maintenance must be in accordance with the <br /> manufacturers' maintenance schedule but not less than every 12 months. <br /> • The Power Supervisor inspects monitoring equipment on a monthly basis. <br /> • Using the capabilities of the UST/IS System, a program was written to run <br /> once each year according to Veeder-Root's specifications and print the <br /> results for each tank location. <br /> There are three diagnostic tests, each for the main and option boards: <br /> -The probe test is a capacitance test for each probe segment. <br /> - The leak test report shown is actually the results of the last test ran in <br /> regular daily testing. <br /> - The annual test shows an"all tests passed" condition. This is to be <br /> expected as any time there is a failure in these areas we would be <br /> notified during our daily polling. <br /> • In addition,physical calibration and physical inspection to recertify the <br /> monitoring equipment is accomplished through a qualified vendor. The <br /> Real Estate Engineer will make the arrangements to have the recertification <br /> done. <br /> G. Describe the training necessary for the operation of UST system, including <br /> piping, and the monitoring equipment: The key personnel on the site are <br /> trained for responding appropriately to any major catastrophe. A training <br /> program conducted by the training department of Pacific Bell provides the <br /> information to the key personnel regarding emergency telephone numbers, <br /> reporting requirements, location of emergency equipment and evacuation <br /> procedures. <br />