Laserfiche WebLink
Site Address: 4051 NEWTON ROAD, STOCKTON <br /> Date of Testing/Servicing: 7 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . .. . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . <br /> . . N. <br /> . .Vsr . . . . . . . . . ij . . . . . . . . . <br /> 4-- �. . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . <br /> . . . . . . . . . . . i . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . <br /> . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: _� _�' <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify locations <br /> of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular spaces, sumps, <br /> dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak detectors; and in- <br /> tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan was prepared. <br /> Page —of <br /> osioo <br />