Laserfiche WebLink
0 <br />0 <br />UNOCAL SERVICE STATION #2859 FEBRUARY 17, 1988 <br />1665 PACIFIC AVE & WALNUT <br />STOCKTON, CALIFORNIA Page 1 of 4 <br />rev. 8/20/87 <br />CONTRACTOR'S SCOPE OF WORK <br />1. Demolish and remove entire facility unless otherwise noted. <br />2. It is the Contractor's responsibility to verify receipt of <br />drawings 1.1 and J-6 and these specifications. By your submission <br />of a bid quotation, it will be considered that you have reviewed <br />the documents for completeness and that no documents are missing. <br />Should any drawings or specifications be missing from the bid set, <br />notify the architect, Robert H. Lee and Associates, Inc., <br />415/461-8890, prior to submittal of bid quotation. No request for <br />any additional costs, as a result of missing drawings will be <br />considered. <br />3. Obtain and pay for all necessary licenses, permits, closure plans, <br />and inspections. <br />4. Arrange for removal of all water, gas, electric and telephone <br />facilities and meters. <br />5. Remove sewer and water lines to property line and cap per local <br />requirements. <br />6. Gas free and remove underground gasoline tanks and waste oil tank <br />per drawing J-6. <br />7. Inspect tanks for any remaining product prior to removal. Report <br />any remaining gasoline or waste oil product to Unocal Engineer <br />immediately for disposal determination, prior to commencing tank <br />removal. See Drawing J-6. Contractor takes title to underground <br />tanks. <br />8. Refill to yard grade and compact all excavations resulting from <br />this work. Compaction is to be engineered to 95%. Backfill <br />material is to be good clean fill or red rock. Provide soil <br />compaction test results from certified soils engineer. Attach <br />these reports and any environmental reports to final invoice to <br />Unocal. See Drawing J-6 for complete backfill opertion <br />requirements. <br />9. Provide soil analysis from tank areas and provide results as <br />stipulated on Drawing J-6. <br />10. Remove all paving, foundations and pump islands. <br />11. Piping, conduit, and light poles are to be completely removed. <br />