My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1994
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5151
>
2300 - Underground Storage Tank Program
>
PR0231219
>
REMOVAL_1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 5:38:02 PM
Creation date
11/6/2018 9:21:44 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1994
RECORD_ID
PR0231219
PE
2381
FACILITY_ID
FA0002836
FACILITY_NAME
SAN JOAQUIN DELTA COLLEGE DIST
STREET_NUMBER
5151
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10816001
CURRENT_STATUS
02
SITE_LOCATION
5151 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\5151\PR0231219\REMOVAL 1994 .PDF
QuestysFileName
REMOVAL 1994
QuestysRecordDate
8/15/2017 3:12:28 PM
QuestysRecordID
3580180
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' BANKS & CO <br /> SUMMARY <br /> ' It is the intent of this program to make all personnel aware of the many hazards <br /> which may be encountered and how to avoid them. On the job training is the most <br /> effective way to learn and apply safe work practices and accident prevention. <br /> It is not possible to teach you every aspect of safety on paper in this program, <br /> ' experience in the field will always be your best teacher. If you are in doubt <br /> as to the safest way to accomplish any task, always ask before you act. Safety <br /> is a part of everyone's job. <br /> CODE OF SAFE OPERATIONS <br /> 1 . This code of safe operations shall be read by all employees prior to <br /> employment by this company and adherence shall be a condition of <br /> ' employment. <br /> 2. Hard hats shall be worn when needed while on any construction project. <br /> ' 3. Proper foot wear shall be worn. Shoes with badly worn or torn soles shall <br /> not be worn. <br /> 4. Observe good housekeeping always. <br /> 5. If you are in doubt as to the safety or safest method of a condition or in <br /> completing a job, get proper instruction before you proceed. <br /> 6. Report all accidents, immediately. <br /> 7. Always use the safest method to complete a job. <br /> ' 8. Know the location of all first-aid, fire extinguisher and other emergency <br /> equipment and phone numbers of closest emergency services. <br /> 9. Use proper protective clothing or gear for specified situations. <br /> ' 10. Store flammables in their proper containers and areas. <br /> 11 . 'Never eater an un-shored or unsafe trench which requires attention to make <br /> it safe. Alert a supervisor. <br /> 12. Never enter a trench without a ladder present within the excavation. <br /> 13. Lift with your legs, not your back. <br /> 14. Get proper instructions before using trench shores. <br /> 15. Equipment shall be operated only by qualified personnel . <br /> 19 SITE SAFETY PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.