My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
7647
>
2300 - Underground Storage Tank Program
>
PR0231227
>
REMOVAL_1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 11:59:30 AM
Creation date
11/6/2018 9:52:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1995
RECORD_ID
PR0231227
PE
2361
FACILITY_ID
FA0004033
FACILITY_NAME
BEST CALIFORNIA GAS LTD #172
STREET_NUMBER
7647
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
07748014
CURRENT_STATUS
02
SITE_LOCATION
7647 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PACIFIC\7647\PR0231227\REMOVAL 1995 .PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE SAFETY PLAN <br /> ENVIRONMENTAL.uE:AJH <br /> PERMITISERVICk S <br /> SITE MANAGER <br /> Mr. William Irwin of Advanced Environmental Services, Inc., will be designated as the <br /> Site Safety Officer during our on-site involvement with the tank removal project. The <br /> Site Safety Officer will be responsible for the implementation of the Site Safety Plan and <br /> will keep a record of the site activities and control of both the primary work zone and <br /> decontamination zone. <br /> TRAINING CERTIFICATI N <br /> Our Site Safety Officer is currently certified for Hazardous Waste Site Operations, with <br /> training received in accordance with 29 CFR 1910.120. All personnel entering the work <br /> zone will be required to present proof of the above certification. <br /> SITE ORIENTATION MEETING <br /> A meeting will be conducted prior to the commencement of work for the purpose of <br /> discussing work zones, physical and chemical hazards, as well as additional elements of <br /> the Site Safety Plan. The meeting will be conducted by the Site Safety Officer. <br /> HAZARDOUS ASSESSMENT <br /> The primary potential hazards generally include physical hazards inherent in equipment <br /> usage, and chemical, both contact and inhalation. Explosion potential is also a concern. <br /> These concerns and methods for safely guarding against each are discussed separately <br /> below. <br /> PHYSICAL HAZARDS <br /> Hard-hats, safety glasses and steel-toed boots will be worn when working within <br /> the primary and decontamination zones. Work zones will be kept in an orderly <br /> fashion to minimize tripping hazards. <br /> CHEMICAL HAZARDS <br /> The primary chemicals expected during the tank removal project include gasoline, <br /> benzene, toluene, ethylbenzene and xylene. If significantly contaminated soil is <br /> encountered, additional protective clothing may include Tyvek suits and gloves. <br /> Glove material should consist of one of the following: neoprene, nitril rubber, <br /> butyl rubber, polyvinyl alcohol or Viton. Emergency response measures to be <br /> taken if skin or eye exposure occurs are presented later in the Safety Plan. <br /> ■■ r� � M <br /> MojAMM <br /> ff M6 <br /> MW <br /> ENVIRONMENTAL SERVICES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.